Lucky I haven’t posted my review yet. I have plenty to say and am sure mine won’t be as good as yours. 😡😡😡😡😡😡😡
Sorry about that, Cazza70. Any words of wisdom or warnings on how to avoid the problems you’ve experienced?
RUN !!
Browse Forums Building A New House Re: Building with Wisdom Homes 12202Aug 31, 2018 2:51 pm navylion Building a Wisdom Homes Manhattan 35 in Sydney North West MyBuildTimeLine: http://navylion.wixsite.com/mybuildtimeline Re: Building with Wisdom Homes 12204Aug 31, 2018 3:16 pm navylion Building a Wisdom Homes Manhattan 35 in Sydney North West MyBuildTimeLine: http://navylion.wixsite.com/mybuildtimeline Re: Building with Wisdom Homes 12205Aug 31, 2018 3:20 pm navylion Building a Wisdom Homes Manhattan 35 in Sydney North West MyBuildTimeLine: http://navylion.wixsite.com/mybuildtimeline Re: Building with Wisdom Homes 12208Sep 01, 2018 7:30 am becks81 Has anyone had their kitchen/joinery quote done recently and had things missing? Our fab consultant picked up some missing details (I didn’t realise they were meant to be in the quote e.g. upgraded shark edge, silk finish to some laminate and some shadowline). Now I’m worried I will miss further details just because I don’t know where they are supposed to appear. It’s quite confusing how your selections appear in different areas, sometimes separately and sometimes in duplicate, i.e. tender vs schedule vs variation vs Timpelle or staircase quite etc. Yes becks81 My Timpelle quote was a bit of a mess. They didn’t quote me on requested items as they deemed was too expensive Caeserstone splashback missing Wrong colour caeserstone. I requested Pure White but they quoted snow instead as they said was much cheaper and nearly the same Wrong thickness of caeserstone throughout house Missing linen cupboards even though in my tender I’m not sure why I even had an appointment as they didn’t listen to my requests Also the Timpelle qoute was all over the place and was difficult to reconcile I thinks it’s great Wisdom are doing some kitchens in their CQ. Re: Building with Wisdom Homes 12209Sep 01, 2018 9:36 am We had an inspection yesterday to check on progress and catch up with our SS properly. We’re now at 26 weeks since our slab went down and 29 weeks since site scrape. We were due to have final painting done this week but some gyprock remediation took longer than expected so we still only have our first coat done. All our electrical, aircon and plumbing fitoff was done last week. We’re still waiting for tiling to be finished as well - our slab needed to be squared off for external tiling and some gyprock adjustments had to be done in our main bathroom so the window would close once the window reveal was tiled. We’re about 3-4 weeks from PCI at this stage (SS reckons 3 weeks unless we have more delays for fixing issues as Wisdom have a QA team that comes in to inspect first, then the construction manager comes in too before we get PCI). The items still outstanding are: - garage door and driveway (due this week) - internal and external painting (due this week) - internal and external tiling to be completed (about 80% finished) - wardrobe and pantry shelving - pantry doors to be fitted (opening was the wrong size) - carpet - internal doors to be hung (frames are in, doors are painted off the frames) - mirrors, shower screens and wardrobe sliding doors - kitchen splashback - balcony railing and privacy screen - flyscreens - door handles and towel rails Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Main kitchen area Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Butlers Pantry (with bonus husband assessing if it’s up to his standards for washing up) Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Love the tapware we opted for instead of the standard inclusions. Like ⋅ 3 comments ⋅ Pin to Ideaboard ⋅ And the super halo shower upgrade. I really wanted to turn it on to test it but our tiling isn’t fully sealed yet in our ensuite. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Not so thrilled with the tiling in our laundry - we paid extra to increase the height of the tiling, the grout lines where the mosaic tiles have been put together are uneven widths (some too wide or narrow) a few of the tiles seem to have too much grout behind them to they stick out and the top where the tiles end isn’t completely straight. Looks like a DIY job I could have done myself (which I seriously considered to save the money but didn’t want it to end up looking like this!) Mentioned it yesterday and definitely going to be raising it at PCI to be fixed if Wisdom deem it acceptable after their inspections. We only picked this up just before we left so we will definitely go over the rest of the tiling with a fine tooth comb at PCI. Building Wisdom Aspiration 31 at Willowdale https://ourwillowdalehome.wordpress.com/ Re: Building with Wisdom Homes 12210Sep 01, 2018 9:38 am becks81 Has anyone had their kitchen/joinery quote done recently and had things missing? Our fab consultant picked up some missing details (I didn’t realise they were meant to be in the quote e.g. upgraded shark edge, silk finish to some laminate and some shadowline). Now I’m worried I will miss further details just because I don’t know where they are supposed to appear. It’s quite confusing how your selections appear in different areas, sometimes separately and sometimes in duplicate, i.e. tender vs schedule vs variation vs Timpelle or staircase quite etc. Hi Becks, Your best friend for the kitchen is your Timpelle's consultant, the vendor will provide you with the full details and design plan. Then the vendor will forward to your CSR. You will see all your variations in your pre-draft end panel, you will verify, add and delete then forward back to your CSR. You got to fix now or you might lose at least 3 weeks if you feel your kitchen variation is a mess. Good luck, Navy navylion Building a Wisdom Homes Manhattan 35 in Sydney North West MyBuildTimeLine: http://navylion.wixsite.com/mybuildtimeline Re: Building with Wisdom Homes 12211Sep 01, 2018 9:51 am Jenifermarie We had an inspection yesterday to check on progress and catch up with our SS properly. We’re now at 26 weeks since our slab went down and 29 weeks since site scrape. We were due to have final painting done this week but some gyprock remediation took longer than expected so we still only have our first coat done. All our electrical, aircon and plumbing fitoff was done last week. We’re still waiting for tiling to be finished as well - our slab needed to be squared off for external tiling and some gyprock adjustments had to be done in our main bathroom so the window would close once the window reveal was tiled. We’re about 3-4 weeks from PCI at this stage (SS reckons 3 weeks unless we have more delays for fixing issues as Wisdom have a QA team that comes in to inspect first, then the construction manager comes in too before we get PCI). The items still outstanding are: - garage door and driveway (due this week) - internal and external painting (due this week) - internal and external tiling to be completed (about 80% finished) - wardrobe and pantry shelving - pantry doors to be fitted (opening was the wrong size) - carpet - internal doors to be hung (frames are in, doors are painted off the frames) - mirrors, shower screens and wardrobe sliding doors - kitchen splashback - balcony railing and privacy screen - flyscreens - door handles and towel rails Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Main kitchen area Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Butlers Pantry (with bonus husband assessing if it’s up to his standards for washing up) Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Love the tapware we opted for instead of the standard inclusions. Like ⋅ 3 comments ⋅ Pin to Ideaboard ⋅ And the super halo shower upgrade. I really wanted to turn it on to test it but our tiling isn’t fully sealed yet in our ensuite. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Not so thrilled with the tiling in our laundry - we paid extra to increase the height of the tiling, the grout lines where the mosaic tiles have been put together are uneven widths (some too wide or narrow) a few of the tiles seem to have too much grout behind them to they stick out and the top where the tiles end isn’t completely straight. Looks like a DIY job I could have done myself (which I seriously considered to save the money but didn’t want it to end up looking like this!) Mentioned it yesterday and definitely going to be raising it at PCI to be fixed if Wisdom deem it acceptable after their inspections. We only picked this up just before we left so we will definitely go over the rest of the tiling with a fine tooth comb at PCI. Building Wisdom Aspiration 31 at Willowdale https://ourwillowdalehome.wordpress.com/ Wow, 4 weeks and handover stage, looking good Jen, I can see the bright light at the end of a very long tunnel. navylion Building a Wisdom Homes Manhattan 35 in Sydney North West MyBuildTimeLine: http://navylion.wixsite.com/mybuildtimeline Re: Building with Wisdom Homes 12212Sep 01, 2018 10:24 am Manhattan52 becks81 Has anyone had their kitchen/joinery quote done recently and had things missing? Our fab consultant picked up some missing details (I didn’t realise they were meant to be in the quote e.g. upgraded shark edge, silk finish to some laminate and some shadowline). Now I’m worried I will miss further details just because I don’t know where they are supposed to appear. It’s quite confusing how your selections appear in different areas, sometimes separately and sometimes in duplicate, i.e. tender vs schedule vs variation vs Timpelle or staircase quite etc. Yes becks81 My Timpelle quote was a bit of a mess. They didn’t quote me on requested items as they deemed was too expensive Caeserstone splashback missing Wrong colour caeserstone. I requested Pure White but they quoted snow instead as they said was much cheaper and nearly the same Wrong thickness of caeserstone throughout house Missing linen cupboards even though in my tender I’m not sure why I even had an appointment as they didn’t listen to my requests Also the Timpelle qoute was all over the place and was difficult to reconcile I thinks it’s great Wisdom are doing some kitchens in their CQ. Thanks Manhattan52! I think things are slightly different now, we went through our selections with the Canvas Quarters consultant who is wonderful, she puts everything into a kitchen schedule and requests Timpelle draw up the quote. Timpelle have missed things. Your issues concern me because the Timpelle quote only says "standard", "deluxe", "supernatural" for the stone, it does not mention the colour. Similarly, the laminate is not mentioned by colour but upgrades to nuance are. Re: Building with Wisdom Homes 12213Sep 01, 2018 10:27 am NavyLion becks81 Has anyone had their kitchen/joinery quote done recently and had things missing? Our fab consultant picked up some missing details (I didn’t realise they were meant to be in the quote e.g. upgraded shark edge, silk finish to some laminate and some shadowline). Now I’m worried I will miss further details just because I don’t know where they are supposed to appear. It’s quite confusing how your selections appear in different areas, sometimes separately and sometimes in duplicate, i.e. tender vs schedule vs variation vs Timpelle or staircase quite etc. Hi Becks, Your best friend for the kitchen is your Timpelle's consultant, the vendor will provide you with the full details and design plan. Then the vendor will forward to your CSR. You will see all your variations in your pre-draft end panel, you will verify, add and delete then forward back to your CSR. You got to fix now or you might lose at least 3 weeks if you feel your kitchen variation is a mess. Good luck, Navy Thanks Navy, is the Vendor you refer to, Timpelle? Re: Building with Wisdom Homes 12214Sep 01, 2018 10:29 am Hey all, I haven't been on here for a while as been hectic at home. We're finally in construction! Our file went to production estimating 15th August and this morning I just received the slab invoice. It seems to be progressing very quickly which is great. Only thing is I still haven't received a call from my site supervisor or know who it is. Is this usual for you guys? I emailed my csr Friday but no reply yet. It's hard to catch her on the phone too. Just planning to do a slab inspection so would have been good to know prior when the slab was being poured so I have enough time to organise. Re: Building with Wisdom Homes 12215Sep 01, 2018 10:30 am becks81 Manhattan52 becks81 Has anyone had their kitchen/joinery quote done recently and had things missing? Our fab consultant picked up some missing details (I didn’t realise they were meant to be in the quote e.g. upgraded shark edge, silk finish to some laminate and some shadowline). Now I’m worried I will miss further details just because I don’t know where they are supposed to appear. It’s quite confusing how your selections appear in different areas, sometimes separately and sometimes in duplicate, i.e. tender vs schedule vs variation vs Timpelle or staircase quite etc. Yes becks81 My Timpelle quote was a bit of a mess. They didn’t quote me on requested items as they deemed was too expensive Caeserstone splashback missing Wrong colour caeserstone. I requested Pure White but they quoted snow instead as they said was much cheaper and nearly the same Wrong thickness of caeserstone throughout house Missing linen cupboards even though in my tender I’m not sure why I even had an appointment as they didn’t listen to my requests Also the Timpelle qoute was all over the place and was difficult to reconcile I thinks it’s great Wisdom are doing some kitchens in their CQ. Thanks Manhattan52! I think things are slightly different now, we went through our selections with the Canvas Quarters consultant who is wonderful, she puts everything into a kitchen schedule and requests Timpelle draw up the quote. Timpelle have missed things. Your issues concern me because the Timpelle quote only says "standard", "deluxe", "supernatural" for the stone, it does not mention the colour. Similarly, the laminate is not mentioned by colour but upgrades to nuance are. No you will be ok. They will specify colour on the plans. With Caeserstone as long as your colour chosen in in the correct category the costingss are the same. Same with laminate Yes they do things very different now. I had a look at CQ when I went to drop off some Cheques and looks fantastic. I would have easily spent another $100k if I went that way Re: Building with Wisdom Homes 12216Sep 01, 2018 10:47 am Hi all, we have lock up confirmed this Tuesday. Garage door and stairs are in, all skirting, architraves delivered, wet areas waterproofing done. Good progress last week. Maj-35 Tend:14/7/17,Cont:18/8/17,DA:9/1/18,DEP:1/2,Const:8/3, Slab: 28/3,Frames:17/4-23/4,Bricks:22/5-14/6,URoof: 29/6,elec:4/8,AC,GRoof:11/8,gyp:24/08,Keys:4/12,move:16/12 Re: Building with Wisdom Homes 12217Sep 01, 2018 10:49 am singalg Hi all, we have lock up confirmed this Tuesday. Garage door and stairs are in, all skirting, architraves delivered, wet areas waterproofing done. Good progress last week. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Maj-35 Tend:14/7/17,Cont:18/8/17,DA:9/1/18,DEP:1/2,Const:8/3, Slab: 28/3,Frames:17/4-23/4,Bricks:22/5-14/6,URoof: 29/6,elec:4/8,AC,GRoof:11/8,gyp:24/08,Keys:4/12,move:16/12 Re: Building with Wisdom Homes 12219Sep 01, 2018 11:03 am becks81 NavyLion becks81 Has anyone had their kitchen/joinery quote done recently and had things missing? Our fab consultant picked up some missing details (I didn’t realise they were meant to be in the quote e.g. upgraded shark edge, silk finish to some laminate and some shadowline). Now I’m worried I will miss further details just because I don’t know where they are supposed to appear. It’s quite confusing how your selections appear in different areas, sometimes separately and sometimes in duplicate, i.e. tender vs schedule vs variation vs Timpelle or staircase quite etc. Hi Becks, Your best friend for the kitchen is your Timpelle's consultant, the vendor will provide you with the full details and design plan. Then the vendor will forward to your CSR. You will see all your variations in your pre-draft end panel, you will verify, add and delete then forward back to your CSR. You got to fix now or you might lose at least 3 weeks if you feel your kitchen variation is a mess. Good luck, Navy Thanks Navy, is the Vendor you refer to, Timpelle? Yes Becks. navylion Building a Wisdom Homes Manhattan 35 in Sydney North West MyBuildTimeLine: http://navylion.wixsite.com/mybuildtimeline Re: Building with Wisdom Homes 12220Sep 01, 2018 2:06 pm Nice progress singalg navylion Building a Wisdom Homes Manhattan 35 in Sydney North West MyBuildTimeLine: http://navylion.wixsite.com/mybuildtimeline Can someone please offer some advice? Im DESPERATE. Because I'm completely and utterly exhausted. How long are variations taking with other companies at the moment? We… 0 18435 In fairness nobody gave a crap about the ACCC and the gag clauses continued in the pro forma templates of a few other builders after the ACCC took on Wisdom, and more… 19 73284 Hi Everyone, I am exploring builder in NSW and received a very tempting quote from Wisdom home for their momentum series. I just want to know experience of building… 0 8206 |