Browse Forums Landscape & Garden Design Re: Crepe Myrtle advice 3Aug 11, 2018 5:04 pm Thanks. I'm going to go the hard prune route tomorrow and lop off half the main trunk so that I can reset and hopefully get some growth outward so it looks more like a "standard" rather than a stick with some branches. Versaloc is a mortarless besser block system that still needs a properly engineered footing. If you just do a 400x200 footing it will fail in time. At 17m long you need it… 1 18354 Hi All, I engaged a tradie to install concrete retaining wall 600-800mm high over 32 meters in Victoria. Sleepers are 200*75*2000 mm installed over 17 steel posts. I… 0 6922 Building Standards; Getting It Right! Don't think they are designed for double brick. WA has a particular way of building and unfortunately that's the way a large amount of sills are finished. 3 7021 |