Browse Forums Building A New House Re: Builder didn't recess our upstairs showers. What can we 2May 21, 2018 1:48 pm Did you check and sign off on your build plans? What about your contract did you check whether it was in the specifications listed with the Contract? Those would be the first starting point I would look at. Re: Builder didn't recess our upstairs showers. What can we 3May 21, 2018 2:03 pm icat2000 Did you check and sign off on your build plans? What about your contract did you check whether it was in the specifications listed with the Contract? Those would be the first starting point I would look at. Yes we checked all our plan and specification documents. It's included in our specifications (which is also our quote document), but it's not included in our plans. How would we know that this particular thing must be included in our plans? There are many things in our specification docs that aren't included in our house plans. Re: Builder didn't recess our upstairs showers. What can we 4May 21, 2018 7:20 pm eltkris icat2000 Did you check and sign off on your build plans? What about your contract did you check whether it was in the specifications listed with the Contract? Those would be the first starting point I would look at. Yes we checked all our plan and specification documents. It's included in our specifications (which is also our quote document), but it's not included in our plans. How would we know that this particular thing must be included in our plans? There are many things in our specification docs that aren't included in our house plans. Re: Builder didn't recess our upstairs showers. What can we 5May 22, 2018 7:30 am If you have paid for it and it is specified it is included in contract regardless of whether it is shown on plans or not. Builder has failed to amend plans to show variations and for instruction to workers on site. Its contract management neglect and builder's fault. You are within your rights to demand it be pulled up and redone. Standard procedure in contract management is to follow through from variation acceptance or inclusion option to annotate construction drawings and to mark them up as revisions with a date and particulars of change, then to distribute revised drawings to supervisors and tradies on site. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog You may still have a case, but your next step is to speak to a lawyer. 3 1578 I have a home gym at home. It weights 150KG including the weight stack. I'm a big boy, around 150KG myself. I was thinking about moving it up stairs to the second… 0 6284 This is the current bathroom with a european laundry. Overall internal dimensions are 3.69 wide and 3.65m deep, including the footprint of the laundry. There is a toilet… 0 10337 |