Browse Forums Building A New House Re: Variance from quote to cost 2May 12, 2018 6:57 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Variance from quote to cost 4May 12, 2018 7:17 pm How much extra did you allow. We allowed $25000 because we were worried we were going to end up with E soil. We did plus N3 wind rating so cost around $27000 in the end. Re: Variance from quote to cost 5May 12, 2018 7:25 pm bestspecials How much extra did you allow. We allowed $25000 because we were worried we were going to end up with E soil. We did plus N3 wind rating so cost around $27000 in the end. For a 211m2 house, $24.5k......came back at $35k Re: Variance from quote to cost 6May 12, 2018 8:33 pm Louis bestspecials How much extra did you allow. We allowed $25000 because we were worried we were going to end up with E soil. We did plus N3 wind rating so cost around $27000 in the end. For a 211m2 house, $24.5k......came back at $35k That does seem a bit. Our house is 250m2. Re: Variance from quote to cost 7May 12, 2018 8:43 pm bestspecials Louis bestspecials How much extra did you allow. We allowed $25000 because we were worried we were going to end up with E soil. We did plus N3 wind rating so cost around $27000 in the end. For a 211m2 house, $24.5k......came back at $35k That does seem a bit. Our house is 250m2. Are you in SA? hey there! 😊 so, it’s kinda common for standard drawer depths to be around 500mm since most cabinets use this size to fit the usual runners… 3 21036 I was being kind to the builder. With the amount charged for the upgrade the builder is probably charging closer to 100% margin. There are a few variables as I… 5 14415 I had 28m2 of engineered pavers laid six months back and it was difficult to find someone not taking the pi$$. Internet suggested it should be $85-100/m2 to lay them.… 3 12563 |