Browse Forums Building A New House Re: First Home - BOLD Portofino 229 - Brisbane 132May 26, 2018 8:24 pm Tribe7, plumbing and electrical rough ins are done, insulation has been installed, baths in and front door is on. Plaster and brickwork have been arranged for next week. I'm a little bit worried about the height of the front door as it's not in line with the top of the front windows and garage door. We have a wood feature panel going across the front portico... so I hope it looks better when this goes up🤞 Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: First Home - BOLD Portofino 229 - Brisbane 133May 29, 2018 1:48 pm chrinee @Tribe7, plumbing and electrical rough ins are done, insulation has been installed, baths in and front door is on. Plaster and brickwork have been arranged for next week. I'm a little bit worried about the height of the front door as it's not in line with the top of the front windows and garage door. We have a wood feature panel going across the front portico... so I hope it looks better when this goes up🤞 Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Wow your flying along bricks and gyprock is super exciting bet you can’t wait to see that installed. I don’t think your door height looks funny at all, when the timber top hatting is installed it will look very grand. Re: First Home - BOLD Portofino 229 - Brisbane 134Jun 08, 2018 10:34 am We've been wondering why we haven't seen more progress over the last week or so. Just found out our Site Supervisor has retired. New Site Supervisor has been in touch to arrange a site visit. He also let us know internals, cabinets and brickwork will start next week. Getting excited again! Re: First Home - BOLD Portofino 229 - Brisbane 136Jun 20, 2018 9:47 pm I'm excited to see how your house ends up looking. I too have just signed a building contract with Bold 2 weeks ago before FHOG reduction. Middle of variations at the moment... I kept too much of the standard fixtures because the girl at the appointment didn't know roughly how much things were going to cost and i didn't want to get my hopes up and exceed my budget. Re: First Home - BOLD Portofino 229 - Brisbane 138Jun 25, 2018 7:43 pm Lots of progress.
A bit disappointed with some of our electrical, but hopefully it is being sorted. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports with photos at every stage,… 6 7165 i would not be signing anything on the day read your contract about when builder submits final invoice generally, have to meet builder within 7 days of receiving final… 1 4749 Hello Josh, This is Irving from PRIMA, we are a manufacturer of the staircase, railings, kitchen cabinets, windows, doors from China. If you have requirement to purchase… 0 5480 |