What else are needed to be done before you get keys?
Not too many things...
1. Gas pipe to dig
2. hot water system to install
3. solar connection
4. some bathroom needed sealing
5. water leaking under kitchen sink
6. cooktop and rangehood to install
7. subfloor hole to patch up
8. rainwater down pipe to lower down (outside)
9. ceiling fans to install
10. missing brick mortar around the house needed to fill in
11. master bedroom toilet to change
12. concrete floor holes to patch up
13. next door neighbour's brick retaining wall to redo after plumber put in storm water pipe into their pit
Last time I saw SS ... worried as he doesn't know when Gas will be connected