Browse Forums Building A New House Re: Signed Initial Working Drawings Incorrect 2Apr 04, 2018 9:13 pm Don't sign anything and get a pls explain Re: Signed Initial Working Drawings Incorrect 3Apr 04, 2018 9:55 pm pandibabi Don't sign anything and get a pls explain YEah, I'm definitely not signing until they get back to me. Hopefully it was an error... Re: Signed Initial Working Drawings Incorrect 5Apr 05, 2018 7:08 am ja2000 Is the retaining wall is necessary due to the sloping block and degree of cut and fill required? Yes the retaining wall is necessary. Re: Signed Initial Working Drawings Incorrect 6Apr 05, 2018 2:03 pm Did you notice that on the initial plan it says 1.5m high and the second says 1.0m high. Even with the extra length, it should cost less to do the second longer lower wall than it would to do the first higher shorter wall. Constant What you have posted isn't really readable and also needs to be compared to your architectural plans. Happy to have a look if you email me at 1 8514 Thanks very much! And would the landscaper/contractor generally involve the engineer or is that something the client would do? Thanks for your help 2 10128 Peter In NSW your Certifier will have a copy, and the Certifier works for you not the builder. They are your representative so just contact them and ask for a… 6 3073 |