Browse Forums Building A New House Re: KDR - Allcastle Homes Grandworth 45 MK2 14Mar 27, 2018 9:27 am just make sure you are getting timber and not laminate, if it's paradot, then it's AC3 laminate which what we were quoted on for 10k. we can get AC3 laminate for around $40 per sqm installed. or $30 if we install it ourself, so the cost wasn't good. my friend installed quickstep ultra after build around 250sqm for 15k and quickstep is on the expensive side for laminate. 80-150 is for engineered or bamboo flooring. you will find the larger the area the cheaper the install. we installing curtains after, already found a few places that does it well on bulk, we getting most of our stuff from lesso home in greenacre. network map i will upload after our clipsal appointment, I don't know how well ventilated the linen upstairs is so decided to put everything in understairs area as we don't use it anyway. yeah we using housepect as well, we not doing the wetarea inspection though, as in NSW the builder need to get a independent inspector to sign off, and the housepect on is visual inspection only. Re: KDR - Allcastle Homes Grandworth 45 MK2 15Mar 29, 2018 10:03 pm Hi, We are also building with All Castle in Blacktown area too. DA and CC done, just waiting for final construction plans (15 days) and then another 4 weeks after that will be hoping for a start on the build. Been ok so far... though whole admin/ selection process seems slow. First signed up for intial tender back in September! I'll be keen to hear others feedback on here and happy to answer any questions that might help others Re: KDR - Allcastle Homes Grandworth 45 MK2 16Mar 29, 2018 11:18 pm Hi cooper , whilst they are slow at least they are not pushy and very accomdative.. Doubt we would get the same treatment if it’s with Clarendon or metricon Re: KDR - Allcastle Homes Grandworth 45 MK2 18Mar 31, 2018 11:44 am metskim Guys can I ask who you used to do demolition and rough estimate I’m in marayong and we are about to do knock down end of june Area dependent but I went with site demo who are the only one came back with a price. Very patience staff and the CDC APPROVAL IS QUICK a month for us for ryde. All up around $29k assuming no rocks or additional asbestos surprises Re: KDR - Allcastle Homes Grandworth 45 MK2 20Apr 04, 2018 10:58 am I used demo C, 24k + additional asbestos 2.3k and vegetation 550 I was given a receipt for dumping it 578 per ton , how to tell whether ... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ They did a clean job and no rework required AC accept it without any comments during handover my house is small 3 Br brick veneer single storey and a car port. Hi we are looking to talk to people who have built with them recently. We have signed mid range built contract but identified that a lot of things are not included.… 0 641 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 13437 |