Browse Forums Building A New House Re: KDRB Bentley Homes Kyalami 370 22Mar 06, 2018 4:07 pm update Pre plaster stage nearly completed, with inspection done by New Homes (see below). The supervisor said of the report that most are small issues some of them they will fix, but some of them (mostly noggins) the volume builders or they wont do at all, theyre 'not necessary' not sure theres much i can do about this, but will see Hopefully they will fix up all the issues; to be fair I don’t think any of them are major, but if left alone they do lead to stuff like cracks, or even fire risks, so I do feel it was worthwhile hiring the inspection, as no chance laypersons can pick up stuff like that. Will keep posted to see if our builders will fix, as have heard stories of builders not willing to act on reports, which is why I didn’t go with one to start. Probably should have had inspections done for the important base stage; frame was partially inspected as part of pre plaster but not in full as some parts weren’t accessible by then. Progress seems good, although was not given any updated timeframes, as it does seem like they will finish faster than the 320 days contracted. Levelling of the site at the back still has yet to happen, but other than that seems ok. Am already starting to think about stuff like building a retaining wall to deal with the deep cut on the west and north sides, fencing etc, hoping to have some of this done just prior to handover so minimise idle time… Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ meals area Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ upstairs area ceiling Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ bathroom Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ upstairs Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: KDRB Bentley Homes Kyalami 370 23Mar 06, 2018 4:08 pm Summary of pre plaster inspection by NHI noggins
Walls and floors
Piping
Re: KDRB Bentley Homes Kyalami 370 24Mar 13, 2018 12:38 pm Oh whoa your house looks amazing.. one of my reports was ignored as the csa changed and I had no idea who was looking after us. But once we had one they looked after the rest (3 reports) and they answered to every point. I think if you also send it to your site supervisor you will probably get a faster reply. Because with us we send it to the csa then we had to wait for her to send to site supervisor or go over with him and it took time. With site supervisor they will reply you when they will do it and when it’s done. Our One did for us. At the beginning communication was sh**t but it’s better now. We are still in maintenance period so whatever I need done I contact him directly and not the office and he gets it done. Don’t be afraid to ask and send emails .. you are paying a lot of money to build your house. Re: KDRB Bentley Homes Kyalami 370 25Apr 08, 2018 6:03 pm Thanks for your help and advice. Im at the first step with sales consultant of Bentley homes craigieburn. Gonna build Ritz445. Tried to be as thorough as possible. Paid 2k. Waiting for colour scheme stage. Will keep you posted. Re: KDRB Bentley Homes Kyalami 370 26Apr 20, 2018 6:34 pm sorry been busy havent updated in a while
eventually they did address most of the issues from inspection but some of the stuff (usually noggins) they said ;volume builders dont do every joint' etc so...not sure what to make of that, those things werent done and yes talking to the supervisor he was happy to walk through each of the issues in teh report with me to say they will fix it (or why they wont) so we cant blame them for communications or response i suspect this is better than some of the other builders already Re: KDRB Bentley Homes Kyalami 370 27Apr 20, 2018 6:37 pm lockup stage was done end of march front Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ back Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ front study, plaster sheets put on Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ meals area Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ upstairs hallway Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ progress is still pretty solid Re: KDRB Bentley Homes Kyalami 370 28Apr 20, 2018 6:39 pm neb880 lockup stage was done end of march front Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ back Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ front study, plaster sheets put on Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ meals area Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ upstairs hallway Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ progress is still pretty solid Making great progress! Are your cabinets in yet? I think that was the most exciting part for me. We are booked for handover next week. Re: KDRB Bentley Homes Kyalami 370 29Apr 20, 2018 6:50 pm fixture stage done mid april doesnt seem that that much extra is involved after lockup in terms of payment, feels like we've paid 90% to date but quite a lot is still not done...oh well exterior is pretty much done including the render Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ kitchen cabinets done but not benches Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ upstairs ensuite and waterproofing done Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ stairs Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ bath Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ seems i have 3-4months wait until everything else is finished... surprised how long it takes to finish up all the details but cant complain, seems good consistent progress and no real big issues Re: KDRB Bentley Homes Kyalami 370 30Apr 20, 2018 6:51 pm Mrs_W neb880 lockup stage was done end of march front Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ back Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ front study, plaster sheets put on Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ meals area Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ upstairs hallway Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ progress is still pretty solid Making great progress! Are your cabinets in yet? I think that was the most exciting part for me. We are booked for handover next week. yep! see my post just below yours! Re: KDRB Bentley Homes Kyalami 370 31Jun 21, 2018 5:27 pm Re: KDRB Bentley Homes Kyalami 370 32Jun 21, 2018 6:05 pm june update about 1 month to go before handover starting to look at quotes for blinds, landscaping etc butler pantry Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ driveway not yet done, waiting on gas line potential for delays there Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ love the splashback Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: KDRB Bentley Homes Kyalami 370 33Jun 21, 2018 11:22 pm Sooo close to being ready. Looks great. I found it really hard seeing your house looking finished when it’s still a month away. I noticed they’ve installed your range hood. They didn’t install ours until after handover with the rest of the appliances. Re: KDRB Bentley Homes Kyalami 370 34Nov 06, 2018 5:14 pm Kevin E Thanks for your help and advice. Im at the first step with sales consultant of Bentley homes craigieburn. Gonna build Ritz445. Tried to be as thorough as possible. Paid 2k. Waiting for colour scheme stage. Will keep you posted. Hi Kevin, if you don’t mind me asking how much did the Ritz end up costing total? With site costs etc. We love the design but not sure if it will fit in our budget. Re: KDRB Bentley Homes Kyalami 370 35Feb 15, 2019 12:09 pm Hi. I'll be building the Kyalami 34 soon (hopefully June-ish) in Mernda. How is the house so far now that you've lived in it? Were there any problems to do after you moved in from Bentley end? How did your maintenance stage go? Would love to see photos if you're ok to share. My concern is the kitchen and the general lighting and power outlets, keeps messing with my mind if i made the right choice with drawers or not, number of lights/powerpoints,etc Re: KDRB Bentley Homes Kyalami 370 36Jul 07, 2020 9:05 pm I'm looking at building the Magellen from Bentley homes on a sloping block in sunbury. How are your houses now thatb you've lived in them for some time? Would love any feedback that might be helpful to me. Thanks in advance Re: KDRB Bentley Homes Kyalami 370 37Jul 07, 2020 9:05 pm I'm looking at building the Magellen from Bentley homes on a sloping block in sunbury. How are your houses now thatb you've lived in them for some time? Would love any feedback that might be helpful to me. Thanks in advance Re: KDRB Bentley Homes Kyalami 370 38Jul 12, 2020 9:52 pm I've been in my Bentley home nearly 2 years now. I'm over in Doreen. This was my fourth build and I'd say that overall they were pretty good. Downside is they are much slower builders compared to the larger scale builders. My advice is to be weary if building with hebel. The company they used seemed to be quite novice, which resulted in them needing to attend multiple times post handover to do / finish the job correctly. I also don't recommend the largest front door they have on offer via Corinthian doors. It has been a 2 year long issue as the door (and replacement door) doesn't seal. Even though this isn't a Bentley issue, rather a Corinthian doors issue, Bentley offer it as an upgrade and I don't recommend you take it. Biggest issue is that I am still dealing with them 2 years later...not sure if you would see that as an issue or a positive that they are still willing to work with me to get things sorted under warranty. The staff have been mostly friendly and helpful. No issues with the house ongoingly in terms of quality of the build (minus the front door!) Hope that helps. Re: KDRB Bentley Homes Kyalami 370 39Jan 15, 2021 9:55 am reps Hi. I'll be building the Kyalami 34 soon (hopefully June-ish) in Mernda. How is the house so far now that you've lived in it? Were there any problems to do after you moved in from Bentley end? How did your maintenance stage go? Would love to see photos if you're ok to share. My concern is the kitchen and the general lighting and power outlets, keeps messing with my mind if i made the right choice with drawers or not, number of lights/powerpoints,etc Hi Kate, We are also looking at building the Magellen with Bentley homes on a sloping block in Doreen....did you end up going with Bentley and if so how is your experience so far. Would love to keep in touch. Cheers Re: KDRB Bentley Homes Kyalami 370 40Jan 15, 2021 9:56 am katemanson I'm looking at building the Magellen from Bentley homes on a sloping block in sunbury. How are your houses now thatb you've lived in them for some time? Would love any feedback that might be helpful to me. Thanks in advance Hi Kate, We are also looking at building the Magellen with Bentley homes on a sloping block in Doreen....did you end up going with Bentley and if so how is your experience so far. Would love to keep in touch. Cheers Your best bet might be to go visit the display homes and walk around in them, and take photos. Get a feel for it in person instead of deciding from the floor plan. There… 1 21409 Keen to hear from people in the area who have got KDRB done on whom they got the build from? Looking for recommendations. Thanks 0 21091 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74688 |