Browse Forums Building A New House Re: My new home in Capestone Mango Hill with Clarendon Wentw 2Sep 05, 2017 12:30 pm Land deposit: 17 Nov 16 Build contract: 17 Apr 17 Land settled: 16 June 17 BA: 23 June Slab: 3 Aug Frame: 21 Aug Enclosed: 10 Oct Fixing: 6 Nov PCI: 14 Dec Settlement: 21 Dec 17 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 https://forum.homeone.com.au/viewtopic.php?f=31&t=88597 Re: My new home in Capestone Mango Hill with Clarendon Wentw 20Jan 15, 2018 9:49 pm jrey I pick this one as bed 4 windows already installed in my house and compare this to my contract plans. Its different Thanks mate!!! Yes they are different in drawing vs actually listed.I got to be careful.. Howdy all. I am looking for feedback on what people would do to maximise and make an area as flat as possible. First, out the front of the house is a sloping hill, pretty… 0 20168 I brought terry road box hill in June 2022 House was meant to be completed Nov 2023 That did not happen I had to chase them so much to the land Registration and… 0 2520 the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 6747 |