Browse Forums Building A New House Re: Build time 2Jan 09, 2018 8:37 pm Hi we are not with metricon but: contract/preconstruction takes around 4-5 months Build takes 4-9 months We were told to allow upto 1 year from initial deposit for preconstruction and construction through construction/preconstruction some times things takes more time and some times they take less(cant really judge with ither builds so much that can affect things) but normal no delay build is round 10-12 months start to finish depending when construction start if Christmas closure effects it/ heat or even rain / availability’s of trades/mAterials all can affect the time frame 9 25063 So still no slab and apparently the concreter cancelled. Here come the delays... apparently things haven't recovered quite as much as I thought. I've been told maybe next… 8 31356 1 13287 |