Browse Forums Building A New House Re: KDR - SE Melb - Simonds Flinders - FRAMING 284Nov 27, 2017 6:11 pm Rachael13 I know this a dumb question but is the frame completed. It's getting darker soon, have you heard if your PI will be onsite. Not sure it’s completely finished or not. I’ll give the PI a call tomorrow and see if they inspected. Re: KDR - SE Melb - Simonds Flinders - FRAMING 285Nov 27, 2017 6:12 pm Ezza78 Oh wow, how exciting!! Looks great. We are still waiting...... Great to see some progress. Do you have a framing date yet? Re: KDR - SE Melb - Simonds Flinders - FRAMING 286Nov 28, 2017 10:35 am Drive past this morning and gutters are going up. Gave the PI a call, inspection was rescheduled for tomorrow (Wednesday) morning. So we'll know more then. Re: KDR - SE Melb - Simonds Flinders - FRAMING 287Nov 28, 2017 11:51 am Bri1234 Drive past this morning and gutters are going up. Gave the PI a call, inspection was rescheduled for tomorrow (Wednesday) morning. So we'll know more then. Well almost there - once u got 👍🏽- u should have roof tiles by Friday- wow that would look like having half the house done follow my build Arden homes Votivo 37 iin south east: https://forum.homeone.com.au/viewtopic.php?f=31&t=88622 Re: KDR - SE Melb - Simonds Flinders - FRAMING 288Nov 28, 2017 3:50 pm Looks like the gutters are done. Looking good More work on the framing today. This afternoon we could see them installing the main bedroom / alfresco sliding door. Woohoo. This picture angle is from the side street. It’s hard to get clear pictures from the front with piles of building materials, the fence, Trucks and workers, lol Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: KDR - SE Melb - Simonds Flinders - FRAMING 289Nov 28, 2017 3:52 pm looking like tomorrow u might have scaffolding for the roof tilers follow my build Arden homes Votivo 37 iin south east: https://forum.homeone.com.au/viewtopic.php?f=31&t=88622 Re: KDR - SE Melb - Simonds Flinders - FRAMING 290Nov 28, 2017 3:53 pm pEast looking like tomorrow u might have scaffolding for the roof tilers That would be nice but I'm thinking they might be delayed by rain looking at the weather reports for the next few days. We'll see. Re: KDR - SE Melb - Simonds Flinders - FRAMING 292Nov 28, 2017 6:31 pm Re: KDR - SE Melb - Simonds Flinders - FRAMING 294Nov 28, 2017 7:22 pm Got to love the house becoming more that just sticks. You must be thrilled with the progress. Good luck with the slab\frame inspection tomorrow. Re: KDR - SE Melb - Simonds Flinders - FRAMING 295Nov 28, 2017 7:45 pm It is fantastic to see it progressing. I’m enjoying this part where we get to see big changes and progress. I’m guessing once it gets locked up the progress won’t be so big. Thanks. Fingers crossed. Re: KDR - SE Melb - Simonds Flinders - FRAMING 296Nov 28, 2017 7:47 pm that proves two things tradies love the sun and the beach. I bet they are in there at 7am and out by 1 Re: KDR - SE Melb - Simonds Flinders - FRAMING 298Nov 28, 2017 8:18 pm brucefil2011 that proves two things tradies love the sun and the beach. I bet they are in there at 7am and out by 1 lol, that would be true for most of the days. Today they were still there at 3.30pm and must have been there a while after to get all the windows in. When they were forming up for the slab they worked both Sat and Sun mornings. We were very surprised. Re: KDR - SE Melb - Simonds Flinders - FRAMING 299Nov 28, 2017 8:22 pm barry157 Hi Bri Following your thread with interest. I saw the third photo above, it appears to show some significant frame overhang over the slab on the LHS? Hi Barry I noticed that in the photo as well, It does look significant. We have PI of the slab and frame tomorrow morning so I'll make sure that is noted down. Re: KDR - SE Melb - Simonds Flinders - FRAMING 300Nov 28, 2017 8:30 pm Bri1234 brucefil2011 that proves two things tradies love the sun and the beach. I bet they are in there at 7am and out by 1 lol, that would be true for most of the days. Today they were still there at 3.30pm and must have been there a while after to get all the windows in. When they were forming up for the slab they worked both Sat and Sun mornings. We were very surprised. see more at hoffmangoldwithporterdavis.wordpress.com We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 36901 The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.… 2 18894 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 13299 |