Browse Forums Heating, Cooling & Insulation Re: Ducted refrigerated after handover for double storey 3Oct 23, 2017 10:03 pm Follow our Arden Toulouse build at http://ardentoulouse.blogspot.com.au Re: Ducted refrigerated after handover for double storey 5Oct 23, 2017 10:36 pm Joker Done it during the build, bit have also previously done another house after the build, had to make sure, ducts were in early and big enough, as air con ducts are bigger than the heating ducts. I am getting them to quote me on upgrading the heating to sp5 so the ducts are bigger. Also 4 zones. They said I can then just add on cooling after. Follow our Arden Toulouse build at http://ardentoulouse.blogspot.com.au Re: Ducted refrigerated after handover for double storey 6Nov 02, 2017 9:41 pm We are building a 46sq double storey. We have a quote for Brivis SP6 heating and Actron 19kw add on cooling (3 phase) for $19k. This includes 18 outlets, 4 multi controlled zones. The installer is installing the duct work during construction and then the heating and cooling post construction. Re: Ducted refrigerated after handover for double storey 7Nov 15, 2017 11:40 am becmm We are building a 46sq double storey. We have a quote for Brivis SP6 heating and Actron 19kw add on cooling (3 phase) for $19k. This includes 18 outlets, 4 multi controlled zones. The installer is installing the duct work during construction and then the heating and cooling post construction. Follow our Arden Toulouse build at http://ardentoulouse.blogspot.com.au Re: Ducted refrigerated after handover for double storey 8Dec 10, 2017 4:50 am geminithinker becmm We are building a 46sq double storey. We have a quote for Brivis SP6 heating and Actron 19kw add on cooling (3 phase) for $19k. This includes 18 outlets, 4 multi controlled zones. The installer is installing the duct work during construction and then the heating and cooling post construction. Who are you building with? Building with Porter Davis. 1 2468 Hi Kristy Around $1.7-1.8m or around $4,600/sqm. if you PM me your email I will send you a break up in a spreadsheet so you can get an understanding of the costs for… 1 450 Surrey Hills, Vic 3127 Garage is being built with metal, 3m distance away from my cover deck. It is parallel to my cover deck, living room, family room and kitchen,… 0 7020 |