Browse Forums Building Standards; Getting It Right! Re: Is this Pre-lay out? 8Sep 09, 2017 11:47 am akash19p, to edit, just click on the 3 dots in the bottom right corner and then click Edit. After you edit the post, click Submit at the bottom left. 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Re: Is this Pre-lay out? 9Sep 11, 2017 10:18 am akash19p They will also provide me with engineers detailed report on the work with termite treatment .. Is it good enough for us to cover ourself if something happens with this work e.g leakage or cracks ... I hope I don't have to go that far .. We are little worried about it. If you have any pictures would be really appreciated. Decka Engineers don't provide detailed reports on the works regarding termite treatment? That won't cover you when the slab and tiles on top start cracking across the F/M/K area Did you take photos of the reinforcement mesh by chance? as poorly place mesh just exacerbates the problem It should have been checked before the pour..too late now Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Is this Pre-lay out? 10Sep 11, 2017 10:35 am Thanks for the reply , you mean when the repoure the mash I should make sure they do it proprly and take pictures of it . They will do it today or tommorrow though. But is it a big issue?? As this is the only solution we have to rectify this issue here ... Re: Is this Pre-lay out? 11Sep 11, 2017 8:38 pm akash19p No, I meant did you take photos of the trenches & reinforcement mesh before the concrete was poured? Soil type?, Dimensions, How close is it a internal longitudinal stiffeners? etc All these factor will influence potential cracking... Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Is this Pre-lay out? 12Sep 11, 2017 10:20 pm StructuralBIMGuy @akash19p No, I meant did you take photos of the trenches & reinforcement mesh before the concrete was poured? Soil type?, Dimensions, How close is it a internal longitudinal stiffeners? etc All these factor will influence potential cracking... Sorry they will do it this week and it's under the kitchen island banch ... They said they will put a rod to support the drainage pipe and put all the mash and required material before the pour the concrete . Solid is A class .. Flat bock ... The land used to be old market garden... Will send you the pics as soon as they do the work .. Thanks for the guideline ... Re: Is this Pre-lay out? 13Feb 04, 2018 4:22 pm To be honest that slab doesn't look right to that drawing, because part of that sand should be a hallway to your front door beside bedroom 1 and the garage. The plumbing looks right if you take into account where the bath and toilet plumbing is, the slab doesn't look right from that pic. We've had the offer of a short term tenant whilst waiting for CDC/DA home approval and demolition for our knock down rebuild. It would achieve a pretty low rent as it's… 0 13752 The fastest thing a builder will do is bank your cheque, those systems work perfectly with lightning speed, everything else is slow burn. Just the way it is. 1 8706 Just to makea point about this, an approach that some people have found sucessful in negotiating these rises down, Is to provide some workings to the builder, specifying… 4 81716 |