Browse Forums Building A New House Re: Henley Electra 2017/2018 build 24Jul 09, 2017 4:40 pm Building the Henley Electra - https://forum.homeone.com.au/viewtopic.php?f=31&t=87341 Re: Henley Electra 2017/2018 build 27Jul 10, 2017 9:06 pm Building the Henley Electra - https://forum.homeone.com.au/viewtopic.php?f=31&t=87341 Re: Henley Electra 2017/2018 build 29Sep 01, 2017 10:55 pm Glad to hear that everything is on track with your build.All the best for the slab.Let us know if Derbacca finds any fault with the slab pour.Did you also opted fro pre slab pour inspection? Also, with regards to window change for study and theatre. Did they showed you during tender how it will actually look ? the panel windows.I have also opted for Clair facade and was wondering if I should change them as well.But not sure how actually they look? We also inspected one under construction Electra house recently and was very happy with the layout.But unfortunately it was Bella facade not the Claire facade so still not very confident with the front look of the house. Re: Henley Electra 2017/2018 build 30Sep 01, 2017 11:49 pm Hey dreamhomz, We have booked Darbecca for the pre slab inspection. We were informed that it is an important inspection to have done. I we pm you with some photos of homes built in the Elle, Adelle and Claire facade. With regards to the Window to study and theatre we got to see them at Tender. I have attached image below. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ How are you going so far with your home? Re: Henley Electra 2017/2018 build 31Sep 02, 2017 1:06 pm Yeah, it will be great if you can pm me the pics for those facades.Thanks earcangel. My lot has not been titled yet , expected date is July next year.I am still browsing few builders and see who has better plan for us. I have given the non-refundable deposit to Henley tough for fixing the price for Electra .But so far we are happy with Henley and most likely we will stick with them. Have a nice weekend!! Re: Henley Electra 2017/2018 build 32Sep 26, 2017 9:33 am We have been allocated an amazing Site Supervisor, Heng Lim. He has been so great so far, keeps in regular contact with us and informs us of the various things taking place on our land. We have been advised that they will be pouring the Slab on the 2 October. So, during the week we went to check out what has been done on our land. So exciting!! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Henley Electra 2017/2018 build 33Sep 26, 2017 9:40 am dreamhomz Yeah, it will be great if you can pm me the pics for those facades.Thanks earcangel. My lot has not been titled yet , expected date is July next year.I am still browsing few builders and see who has better plan for us. I have given the non-refundable deposit to Henley tough for fixing the price for Electra .But so far we are happy with Henley and most likely we will stick with them. Have a nice weekend!! Hi dreamhomz, I have PM you some photos . It is great that you have fixed the price with Henley for the Electra. Are you going to make any changes to the original Electra Floor Plan? My husband and I have been so impressed 3rd time building with Henley. This has to be our best experience with them so far. There service has been awesome. It is great that you are doing your research because it just gives you peace of mind that you have looked at all options. Re: Henley Electra 2017/2018 build 34Oct 02, 2017 9:04 pm Hi earcangel, Thanks for putting the detailed drawings; it will help others make similar changes if needed. I would have made a couple of changes if I had seen these too. How did the slab pour go today? Building the Henley Electra - https://forum.homeone.com.au/viewtopic.php?f=31&t=87341 Re: Henley Electra 2017/2018 build 37Oct 02, 2017 10:12 pm Wow.. that looks great!! Did Derbecca found any issues at pre-pour or after slab? Re: Henley Electra 2017/2018 build 38Oct 02, 2017 10:22 pm dreamhomz Wow.. that looks great!! Did Derbecca found any issues at pre-pour or after slab? Eskay, there were a couple of things, Darbecca got them to fix it while they were there. Everything else was great. Will you be sharing your house plans at any stage. Would so love to see it. Re: Henley Electra 2017/2018 build 39Oct 07, 2017 12:17 pm Framing complete on ground floor. So exciting to finally walk through ground floor and see the layout. First level should be completed by end of next week. Great progress so far. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Henley Electra 2017/2018 build 40Oct 12, 2017 9:46 pm Excited to see your house come up quickly; hope it goes smoothly for you !! Building the Henley Electra - https://forum.homeone.com.au/viewtopic.php?f=31&t=87341 Hi, If you give a set of criteria as to what means 'good' to you, it'll give others prompts to respond. We considered Henley early on but there were two factors that… 1 10416 Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing… 7 17198 thank you! do we need to get this or our builder before we commence new build on the block? 2 10261 |