Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 14043Aug 09, 2017 4:11 pm KDR Masterton Harmony Elite + custom granny flat Aug 2015 - Deposit paid Dec 2015 - Contracts signed Feb 2016 - Colours appointments Mar 2016 - DA submitted Jun 2016 - DA approved Re: Masterton Homes - The next thread 4.0 14047Aug 10, 2017 4:39 pm Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 14055Aug 13, 2017 1:46 pm Roxy those drawers are atrocious! No way you should accept that. Obviously the cabinet maker has gone for worst case scenario. It doesn't actually look like the plumbing is in yet. The cabinet maker should wait for plumbing to go in before measuring the drawers. The plumber should also be advised that drawers are going in so they can minimise the space occupied by the drain pipes. Never argue with an idiot they drag you down to their level & then beat you with experience - Dilbert View Thread: viewtopic.php?f=31&t=19733 Contract signed 14Sept Slab 30Sept Bricks laid 1Dec Lock up 26Feb Keys 10Jun Re: Masterton Homes - The next thread 4.0 14056Aug 13, 2017 3:36 pm pommie Thanks Gisbson, There is a legend in the old catalogue and it refers to Platinum packages which apparently don't exist now so we are no the wiser. P is an upgrade item , if you bought the Platinum package when it was available you got all of the 'P' items included. Otherwise you can buy them as individual upgrades. Villina Lane 11/14 $3900 08/15 Contract 11/15 DA Approval 02/16 Demolition 03/16 Peg out 06/16 Slab 06/16 Ground floor frame 07/16 1st floor frame & windows 09-12/16 Bricks blog Re: Masterton Homes - The next thread 4.0 14057Aug 13, 2017 3:38 pm Rox82 those drawers are ridiculous. There may as well be no drawers there at all if that's the best they can do. Villina Lane 11/14 $3900 08/15 Contract 11/15 DA Approval 02/16 Demolition 03/16 Peg out 06/16 Slab 06/16 Ground floor frame 07/16 1st floor frame & windows 09-12/16 Bricks blog Re: Masterton Homes - The next thread 4.0 14058Aug 13, 2017 4:05 pm Rox82 this is what our ensuite pipes look like. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Villina Lane 11/14 $3900 08/15 Contract 11/15 DA Approval 02/16 Demolition 03/16 Peg out 06/16 Slab 06/16 Ground floor frame 07/16 1st floor frame & windows 09-12/16 Bricks blog Re: Masterton Homes - The next thread 4.0 14059Aug 13, 2017 4:08 pm Gibson pommie Thanks Gisbson, There is a legend in the old catalogue and it refers to Platinum packages which apparently don't exist now so we are no the wiser. P is an upgrade item , if you bought the Platinum package when it was available you got all of the 'P' items included. Otherwise you can buy them as individual upgrades. I was told Platinum doesn't exist anymore. We purchased the Mansion and YES packages. Re: Masterton Homes - The next thread 4.0 14060Aug 13, 2017 5:59 pm Hi Pommie, The Platinum range is an upgrade over and above Yes and Mansions. It doesn't matter that there is no Platinum package now , if you want a door marked 'P' then it's extra and you will need to ask M for a price. Villina Lane 11/14 $3900 08/15 Contract 11/15 DA Approval 02/16 Demolition 03/16 Peg out 06/16 Slab 06/16 Ground floor frame 07/16 1st floor frame & windows 09-12/16 Bricks blog 4 16727 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 16001 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20176 |