Browse Forums Building A New House Re: Building a Clarendon parkhill 29 in Brisbane 17Aug 11, 2017 2:07 pm cm4 Yes, this is the new distance after we extended that wall back. From memory, we asked them to extend that wall to the same width as the down stairs hallway. No, we didn't extend the alfresco. The grand alfresco is gorgeous and we did contemplate extending, it was just other must have's took priority. We love entertaining so we do want to create a nice space there and in our backyard, but it'll probably be a day 2 or 3 project (when we have more money 😞 ) Will definitely keep you all posted and share photos. Now that we have our colour and tiling appointment scheduled I'm feeling overwhelmed with making such big final decisions. (Hubby said he's leaving colour choices with me.) I was looking and pinning ideas on Pinterest for months, but I'm realising it's actually a waste of time because the stuff you see on Pinterest are from custom designer homes who aren't limited by vendor or budget. Like jaylex x kind of disappointed at the limited tile options Beaumont Tiles have. Re: Building a Clarendon parkhill 29 in Brisbane 18Aug 16, 2017 8:46 pm elleimac Hi All We're building a Parkhill up in Gold Coast! And Rebekah, we're from Sydney and moving up to QLD so we're doing it all from here too!! A bit of history. We purchased our land back in September and their sales pitch was it would be ready by December 2016 but the land only finally registered end of June 2017. We've been liaising with their Clarendon since January this year and they've done plans and specified rough costs to us since, so now we're keen to get the ball rolling faster now that we can build. We're at contract signing stage now. We received the contract from Clarendon on Tuesday and after we sign it we give them the go ahead to start the process of construction, as well as obviously start dropping a lot of money. Like everyone else building we can't wait for them to start, we can't wait to move up, we can't wait to get our home. Happy to answer any questions you all may have, I'm no expert but happy to share our experience so far. Us, we made a lot of structural changes to our Parkhill, so already we're up 130K from the base price, and we haven't even had our electrical and flooring appointment yet ... yikes!! Cam Ohh wow! How exciting! It's a bit tricky doing it all from here isn't it. We just keep visiting the parklea displays and their colour studio here. We went to the Brisbane one on Monday and it's sooooo much smaller and no where near as much info. Wow that's a lot of changes. We don't have much moving room in our budget and this is our first house and with 2 boys under 5 we aren't keen to go too high end just yet. I just finished reading your blog post. I love what you have done with your laundry. I would prefer that for sure. I'm not a big fan of the pantry opening into the laundry. But we don't have much land to extend. Only 350m2 block. Would be great to keep throwing ideas around, I didn't get any notifications that anyone had replied to this post, just came back and found it all on here now. Re: Building a Clarendon parkhill 29 in Brisbane 19Aug 16, 2017 8:50 pm jaylex Hello Everyone, We have also chosen the design of Clarendon Parkhill in 34, building in northeast Brisbane. Like elleimac here, we did love the idea of having the staircase tucked away behind the kitchen. We got our quote after listing all our "must have's" and shied away when we got the price. We started to look elsewhere, with another builder who had the exact same design. In the end, the Parkhill 34 was much more competitive in price and the consultant was pleasant to deal with. We are now in the tendering process sorting out all the tiny details. Not fun. Extras we included: Grand Alfresco with extended concrete Added Bathroom downstairs Sliding doors to the Living Room next to the study. Converted WIP to Butler's pantry Upgraded a few items in the kitchen. like undermount sink & glass splashback (I don't enjoy cleaning the grout) We're still waiting for our Land to be registered which is expected to be from Jan to March 2018. (A long time to wait but it's already Aug !) A little nervous about extra costs after the soil test. I look forward to seeing all of your future posts in here. Hey! We are building in Newport, is that a similar area to you? Our land has just been bumped back from a sept registration to November. Hoping it's not further than that! I agree we are fans of the tucked away stairs. Love the idea of not making a feature of them. We also added a door to the front lounge room and added the shower downstairs. We also went the undermount sink. Haven't decided what to do with the splashback. But I'm not great with cleaning our granite one we have now. We have done our tender revisions, which I want to revise again now. Joys of having so much time to think. Re: Building a Clarendon parkhill 29 in Brisbane 20Aug 16, 2017 8:54 pm cm4 Hi fellow Parkhill People!, So we have decided on the Parkhill 29. We are in the process of going to tender and are just waiting on a few extra costings. We are just waiting on estimates for moving a wall 500mm in one of the bedrooms to make it bigger, and are entertaining the idea of closing in the alfresco and doing a deck and patio type thing on the back ourselves after handover. Also maybe getting the garage plus where there make it bigger for extra storage. But this will all come down to price!! So we have added/upgraded: Sapphire Kitchen - under mount sink, 900mm bench, cupboards above the rangehood Higher ceilings on the ground floor Larger front door Sliding door to study Stone top to powder room Stacker doors to alfresco if we don't close it in Is anyone adding the full stackers to the alfresco area? Like what they have in the displays (usually in bi folds) where you can open the whole walls to the outside? I love it but don't know how practical it is when you add flyscreens etc Also has the finishing under the stairs such as plaster, paint and tiles been included in your tender/pricing? I don't think it is in ours. Anywho - looking forward to keeping up to date with everyone's progress. We are doing the cornerless stacking doors with recessed tracks. The tracks have a track just for flyscreens so you can add them in later. I haven't even looked into that yet. I'm not so much a fan of them when the track isn't recessed though, it's more like an annoying step to trip on if it's raised. Ours are just shy of 7k I think. But we feel they really add that alfresco into the house. I asked our sales rep and the under the stairs is all finished like the rest of the laundry as per the display homes. I was also wondering if it was or not. the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 6738 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 7863 Hello Josh, This is Irving from PRIMA, we are a manufacturer of the staircase, railings, kitchen cabinets, windows, doors from China. If you have requirement to purchase… 0 5461 |