Browse Forums Building A New House Re: Building With AllCastle Homes 18Aug 05, 2017 9:12 am Thanks it's for the reply Rent we have covered and we will need furniture as with 3 growing kids they won't stay little for long. We have basically budgeted $60k for upgrades as we knew the display homes are optioned to the hilt. Worse case the landscaping budget can take a hit if we need it. Re: Building With AllCastle Homes 19Aug 07, 2017 12:54 pm Hydraulic design and drainage cost is by owner. You seem in developed area so get council drainage map check the storm water pipe connection. ( make sure no easement issues) Building a bigger house means drainage requirement increase. I end up put in 10kL water tank. I took the Ultra infinity upgrade. 8k. Sales person can give you the upgrade price reference for Alfresco 20+ , bathroom upgrade , downstair toilet, the stairs (20K). Front fence, steps, landscape all by owner so you can worry it later. Hi we are looking to talk to people who have built with them recently. We have signed mid range built contract but identified that a lot of things are not included.… 0 740 Was the offer also on their website? If so, you could check the Wayback Machine. 1 1009 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74716 |