Browse Forums Building A New House Re: Who's building with Clarendon?? 17504Jul 16, 2017 12:02 am Building Wentworth 33 CDC lodged to Council : 22 June 2018 Site excavation 31 July 2018 Slab 08 Aug 2018 Frame 22 Aug 2018 Roof 10 Sep 2018 Brick 24 Sep 2018 Re: Who's building with Clarendon?? 17507Jul 16, 2017 2:06 pm My Phoenix by Metricon in Melbourne viewtopic.php?f=31&t=83584&p=1570829&hilit=my+phoenix+by+metricon+in+melbourne#p1570829 Re: Who's building with Clarendon?? 17509Jul 16, 2017 4:49 pm Building Wentworth 33 CDC lodged to Council : 22 June 2018 Site excavation 31 July 2018 Slab 08 Aug 2018 Frame 22 Aug 2018 Roof 10 Sep 2018 Brick 24 Sep 2018 Re: Who's building with Clarendon?? 17518Jul 20, 2017 3:27 pm ajedi2k Hi all As mentioned earlier I got my handover next Friday. I did my final housepct inspect on Tuesday. Mind you this was a mission it self. Ss didn't allow them to go in initially and asked them to wait until handover. But long story short I managed to get them in. Warning: don't trust the Clarendons so claimed 200 point check before last two weeks of handover. During my walk through I only saw paint touch up issues. But the report came back with many more small defects which I wouldn't have known. Ex. Insulation on ceiling and sarking is not done properly. Down lights holes not correct size. Cabinet minor damages etc. Interestingly my SS asked for the report so he can give it to the handyman. So I highly recommend getting this final report done on or before your handover. Great news ajedi2k that you finally your house is completed. .. In regards to sarking and insulation as our gyprock has been done what is not done right. ... I am so feed up with clarendon already can't stand their excuses. .. Its good you are sharing your experience so that everyone is alert what to expect. All the best with your handover. . Re: Who's building with Clarendon?? 17519Jul 20, 2017 3:35 pm Mrs RS ajedi2k Hi all As mentioned earlier I got my handover next Friday. I did my final housepct inspect on Tuesday. Mind you this was a mission it self. Ss didn't allow them to go in initially and asked them to wait until handover. But long story short I managed to get them in. Warning: don't trust the Clarendons so claimed 200 point check before last two weeks of handover. During my walk through I only saw paint touch up issues. But the report came back with many more small defects which I wouldn't have known. Ex. Insulation on ceiling and sarking is not done properly. Down lights holes not correct size. Cabinet minor damages etc. Interestingly my SS asked for the report so he can give it to the handyman. So I highly recommend getting this final report done on or before your handover. Great news ajedi2k that you finally your house is completed. .. In regards to sarking and insulation as our gyprock has been done what is not done right. ... I am so feed up with clarendon already can't stand their excuses. .. Its good you are sharing your experience so that everyone is alert what to expect. All the best with your handover. . RS. yes your sarking shouldn't have any issues at this stage however your insulation on the ceiling doesn't need to be perfect. They actually don't complete roof insulation until both aircon and electrical final fit out. Ie ceiling insulation is the last job on your roof. I knew my one will have issues, eureka insulation guy was there past 7pm working in the dark, I can only assume he had a head light on. But obviously he missed the quality check after the final job. Visit my blog Clarendon Bronte 25 Re: Who's building with Clarendon?? 17520Jul 20, 2017 4:14 pm ajedi2k Hi all As mentioned earlier I got my handover next Friday. I did my final housepct inspect on Tuesday. Mind you this was a mission it self. Ss didn't allow them to go in initially and asked them to wait until handover. But long story short I managed to get them in. Warning: don't trust the Clarendons so claimed 200 point check before last two weeks of handover. During my walk through I only saw paint touch up issues. But the report came back with many more small defects which I wouldn't have known. Ex. Insulation on ceiling and sarking is not done properly. Down lights holes not correct size. Cabinet minor damages etc. Interestingly my SS asked for the report so he can give it to the handyman. So I highly recommend getting this final report done on or before your handover. Hi there, Thanks for the advise. Can I ask who did your inspection? Thanks the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 6736 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 7859 |