Not anymore - bunch of guys at work just got theirs through an online mob called blue something or other. Cards all arrived 2-3 days later, no stat dec required
Browse Forums Building A New House Re: Building with Metricon 5601Jul 01, 2017 9:54 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 5604Jul 01, 2017 10:53 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 5607Jul 01, 2017 11:31 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 5613Jul 03, 2017 1:41 am Cheers Nom Newhaven 36 by M Blog - North Shore Newhaven (http://nsnewhaven.blogspot.com.au) Build - https://forum.homeone.com.au/viewtopic.php?f=31&t=85092 Re: Building with Metricon 5617Jul 03, 2017 7:40 pm Cheers Nom Newhaven 36 by M Blog - North Shore Newhaven (http://nsnewhaven.blogspot.com.au) Build - https://forum.homeone.com.au/viewtopic.php?f=31&t=85092 Building with Metricon 5620Jul 04, 2017 8:58 am PVBuild jessicagauci Renman [quote="jessicagauci"] Yep all the time and I still do. Though I don't make out though I have been on site without them. When I am meeting on site I just do a quick walk around and then bring up the issues as if I have just seen them. Same here. We've installed noggins (and our SM told us he'd turn a blind eye if we did).. and will just let our independent inspectors know so they don't ping M at inspection. I've even called the SM when I've gone there in the evening and found a plumbing leak - water getting all over the bedrooms as a insulation installer had nicked a pipe. Turned the mains off and the SM thanked me for picking it up. Tradies have rocked up and found me on site - weed spraying. No issues. With your framing issues I'd be surprised if that quality passed M's QA.[/quote] That's a good idea. I wanted to go and install some extra noggins for where our towel racks will be and our future dryer might go. It's good that he doesn't mind. Well when I raised it he kept saying it was fine and it will pass the QA. I said that's fine, but as the paying customer, I would please like to have it replaced. He continued to argue with me so I went to his boss. Now we are waiting on the plumbers to come back to fix the plumbing work, as we paid for two water inlets and two hot water systems to service each end of the house. Only 1 was accounted for with no gas pipes going to the gas hot water unit. They wanted to start gyprocking though I brought it to his attention and we are just waiting for head office to sort it out. The tradies have had old plans without our variations which is causing a lot of errors. Some supervisors don't like owners that are thorough and on the ball. But hey, if they do it right the first time they won't have to come back and do it again. Like you say, sometimes you can actually pick up on errors for them that will save them time and money. Hi, First of all, thank you to this community for sharing your thoughts and opinions. We are in early days of our pre-contract stage for Metricon Doulton and we are… 0 10733 Hello All 🙂 We are planning to start our journey of construction our first home. We zeroed down on Metricon and henley homes based on design suitable for our lot and… 0 8179 We don’t live in VIC so want to know the exterior colours of Lumiere display so we can see it at the paint shop. Not building with Metricon so my request went… 0 17330 |