That is a 3 glass panel door. With 2 sliding and stacking on top of each other.
Mine was $1250 for 2127 stacker.
Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 13723May 01, 2017 11:01 pm 2013 1st tender 24/10 Dep. 18/11 2014 5% 25/02 CDC approval 5/5 Demo 26/5 Pool 3/7 Valid'n 10/7 Slab 11/8 Frame 19/9 Bricks 23/10 2015 Roof 3/12 Lock up 11/2 PCI 31/3 Final insp. & keys 30/4 Re: Masterton Homes - The next thread 4.0 13724May 02, 2017 6:42 am Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 13728May 03, 2017 3:37 pm WOW Villinaeliters ... wonder if that new frameless shower trend will take off? Shell90 - We moved into Construction in December 2016. Think it was in the second week of December <insert fuzzy memory here>. Your ceilings look AMAZING. Wow. Just wow. We've had good progress so far this week, the slab for our secondary dwelling/oversized granny flat was poured on Monday and today the insulation for the main house was delivered. Our SS is confident that he can power on with the granny flat to bring it up to speed with main house (we are almost at gyprocking). The two dwellings are due to be completed/handed over together. Fingers crossed. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ KDR Masterton Harmony Elite + custom granny flat Aug 2015 - Deposit paid Dec 2015 - Contracts signed Feb 2016 - Colours appointments Mar 2016 - DA submitted Jun 2016 - DA approved Re: Masterton Homes - The next thread 4.0 13731May 04, 2017 10:51 am Rox82 I feel your pain. We are 12 weeks over contract and we're promised PCI mid this month but that's already looks like moving to the start of June. Quality is good but so slow ! Villina Lane 11/14 $3900 08/15 Contract 11/15 DA Approval 02/16 Demolition 03/16 Peg out 06/16 Slab 06/16 Ground floor frame 07/16 1st floor frame & windows 09-12/16 Bricks blog Re: Masterton Homes - The next thread 4.0 13732May 04, 2017 11:51 am GillyM shouldn't be too hard to adjust to this ..... http://i832.photobucket.com/albums/zz241/GillyM63/newhouse_zpsaqtm42oi.png Wow GillyM! What is the area? 2014 30/05 $3900 25/08 Contracts 02/10 DA submitted 2015 17/02 DA approved 02/04 Colors 10/04 Demo 09/07 Construction start 27/07 Fill 15/08 Slab 21/09 Frame 2016 08/01 Bricks Re: Masterton Homes - The next thread 4.0 13733May 04, 2017 4:55 pm Berry NSW ...... on the eastern side, so just south of Gerroa Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 13735May 04, 2017 7:07 pm hehehehe...... well there IS plenty of space for social gatherings, Gibson !!!! Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 13736May 05, 2017 1:32 pm Gibson / Rox82, same here. Way over and snails pace. Almost no progress from just before Easter until this week when a few trades pitched up. So close for so long. We keep taking leave at work (predicting a move a month away) and cancelling. No major complaints on quality either but it's come at a big cost of 1yr extra rent compared to having gone with another builder. Sigh. Just have to suck it up Re: Masterton Homes - The next thread 4.0 13737May 05, 2017 2:14 pm Does anyone happen to have a price list for the base price of all the masterton designs? The Tiffany 3 bedder in particular! Thank you! http://preludehome.tumblr.com/ Re: Masterton Homes - The next thread 4.0 13738May 05, 2017 2:18 pm Hi All, Did M charge anyone for removal of grass and soil? Is this something the owner can do instead of paying M? Also, how much extra did they charge if they hot rock during excavation? TIA Re: Masterton Homes - The next thread 4.0 13739May 05, 2017 8:42 pm Hey Saltwater71, We had excess Spoil Removal charged when our site was scraped. It surprised us as we didn't think our site was in too bad shape (we mowed grass super short before poisoning the grass). But it was explained to us that they needed to scrape back to root base so no organic matter under slab. We were charged around $550 per 12 tonne truck load. No nasty surprises with hitting rock for us. This week we've had insulation installed and the stormwater plumbing for our oversized granny flat. Hopefully gyprocking next week. Cannot wait to see rooms take shape. KDR Masterton Harmony Elite + custom granny flat Aug 2015 - Deposit paid Dec 2015 - Contracts signed Feb 2016 - Colours appointments Mar 2016 - DA submitted Jun 2016 - DA approved Re: Masterton Homes - The next thread 4.0 13740May 05, 2017 9:30 pm MartinsHarmony Hey Saltwater71, We had excess Spoil Removal charged when our site was scraped. It surprised us as we didn't think our site was in too bad shape (we mowed grass super short before poisoning the grass). But it was explained to us that they needed to scrape back to root base so no organic matter under slab. We were charged around $550 per 12 tonne truck load. No nasty surprises with hitting rock for us. This week we've had insulation installed and the stormwater plumbing for our oversized granny flat. Hopefully gyprocking next week. Cannot wait to see rooms take shape. That's what we are getting charged too! How many truckloads did yours turn out to be? Why wasn't this cost put in tender? 4 16750 i imagine you also have another contract with an architect? and yeah, whatever other's said about special conditions and appendices 16 16026 Hi all I am looking to run a water line under my concrete footpath which is directly next to my home, was seeing if this is possible without cutting the entire section… 0 20191 |