Browse Forums Building A New House Re: Additional Site cost At Jordan Spring East (Stage-2) 12Apr 20, 2017 11:34 am ----------------------------------------------------------------- Land - Oct 2016, Stamp Duty-Dec 2016, Land Registration - May 2017?? Domaine Homes - Arizona 26 - Feb 2017 Re: Additional Site cost At Jordan Spring East (Stage-2) 13Apr 20, 2017 12:25 pm Yeah they told me that on Friday when I called them too. At least stage 1 looks closer to registering now than ever. Interesting to see what the new suburb name is too now that it is apparently not llandilo or Jordan springs east Re: Additional Site cost At Jordan Spring East (Stage-2) 14Apr 20, 2017 12:53 pm @MR.India The information you require is in AS2870-2011 sect 5.5 Requirements for aggressive soils HTH Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Additional Site cost At Jordan Spring East (Stage-2) 15Apr 20, 2017 1:42 pm ----------------------------------------------------------------- Land - Oct 2016, Stamp Duty-Dec 2016, Land Registration - May 2017?? Domaine Homes - Arizona 26 - Feb 2017 Re: Additional Site cost At Jordan Spring East (Stage-2) 16Apr 20, 2017 1:51 pm @Mr.India I suggest you get your own soil test & geotech report and ask to have it credited back Construction In Bushfire zones AS3959 sect 5 Please post back if you require further Info Cheers Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Additional Site cost At Jordan Spring East (Stage-2) 17Apr 22, 2017 4:24 pm we are building with new living homes and they have included all the above mentioned in site costs just to avoid unpleasant surprises later on. better to know the maximum price upfront. if they are not needed, price goes down. Re: Additional Site cost At Jordan Spring East (Stage-2) 18Apr 22, 2017 6:10 pm manpreet kaur we are building with new living homes and they have included all the above mentioned in site costs just to avoid unpleasant surprises later on. better to know the maximum price upfront. if they are not needed, price goes down. We are building with them too. Which design did you go for? We are stage 2 Re: Additional Site cost At Jordan Spring East (Stage-2) 19Apr 22, 2017 6:52 pm blissjohnson2 manpreet kaur we are building with new living homes and they have included all the above mentioned in site costs just to avoid unpleasant surprises later on. better to know the maximum price upfront. if they are not needed, price goes down. We are building with them too. Which design did you go for? We are stage 2 we got maple 4. and we are stage 2 as well. lot 2251 Re: Additional Site cost At Jordan Spring East (Stage-2) 20Apr 22, 2017 7:03 pm manpreet kaur blissjohnson2 manpreet kaur we are building with new living homes and they have included all the above mentioned in site costs just to avoid unpleasant surprises later on. better to know the maximum price upfront. if they are not needed, price goes down. We are building with them too. Which design did you go for? We are stage 2 we got maple 4. and we are stage 2 as well. lot 2251 We are 2033. Hopefully everything runs smoothly. The maple 4 is a nice design! Our standard double-glazed window is tested to achieve, Rw 34, and can be glazed to suit Rw 39. The price is good too... 3 9472 DIY, Home Maintenance & Repair We purchased a 1960s property that is on timber stumps mostly, and a newer section is on concrete stumps. We had a building inspection initially and they reported some… 0 12743 We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37143 |