Browse Forums Building A New House Re: My KDR Metricon Hampshire - Liberty - 45 Melb 404Apr 08, 2017 7:48 am aujahua Hi Renman, Could you please recommend any Metricon sales consultant ? With all the upgrades you listed, could you provide a rough figure? My sales consultant was Michael Davies who is at the Somerset display home in Glen Waverley. But I have heard that there's a lady (will find out her name) at the Boudreaux that is really good. Our build is nearing $800K-$810K (we still have a list of variations coming). This does include carpet and floorboards that we are doing post handover ($50k), WIR still needs to be quoted. If we get close to $860K we will be kinda happy. Re: My KDR Metricon Hampshire - Liberty - 45 Melb 405Apr 08, 2017 8:12 am Renman aujahua Hi Renman, Could you please recommend any Metricon sales consultant ? With all the upgrades you listed, could you provide a rough figure? My sales consultant was Michael Davies who is at the Somerset display home in Glen Waverley. But I have heard that there's a lady (will find out her name) at the Boudreaux that is really good. Our build is nearing $800K-$810K (we still have a list of variations coming). This does include carpet and floorboards that we are doing post handover ($50k), WIR still needs to be quoted. If we get close to $860K we will be kinda happy. Thanks Renman, That sounds like a upgrade of 400k+ with budget of 800k+ why pick M ? Why not consider other builder like L37 or Glenvill? Cheers, My KDR Metricon Hampshire - Liberty - 45 Melb 406Apr 08, 2017 8:20 am aujahua Renman aujahua Hi Renman, Could you please recommend any Metricon sales consultant ? With all the upgrades you listed, could you provide a rough figure? My sales consultant was Michael Davies who is at the Somerset display home in Glen Waverley. But I have heard that there's a lady (will find out her name) at the Boudreaux that is really good. Our build is nearing $800K-$810K (we still have a list of variations coming). This does include carpet and floorboards that we are doing post handover ($50k), WIR still needs to be quoted. If we get close to $860K we will be kinda happy. Thanks Renman, That sounds like a upgrade of 400k+ with budget of 800k+ why pick M ? Why not consider other builder like L37 or Glenvill? Cheers, We tried both of them. For the same size home and list of upgrades Glenvill wanted 1.1M. Re: My KDR Metricon Hampshire - Liberty - 45 Melb 407Apr 09, 2017 12:40 am We've heard a lot of good things about Actron but I don't think we have Actron here in Sydney Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846 Build thread: Metricon Liberty 45 in Ryde, NSW Re: My KDR Metricon Hampshire - Liberty - 45 Melb 408Apr 09, 2017 9:24 am Quirmeball1280 We've heard a lot of good things about Actron but I don't think we have Actron here in Sydney Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846 Actron is starting to advertise on TV in Melb. They seem to have a good rep and a lot of new features the others aren't doing. What do you use/have up there? Re: My KDR Metricon Hampshire - Liberty - 45 Melb 409Apr 09, 2017 6:17 pm Renman Quirmeball1280 We've heard a lot of good things about Actron but I don't think we have Actron here in Sydney Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846 Actron is starting to advertise on TV in Melb. They seem to have a good rep and a lot of new features the others aren't doing. What do you use/have up there? We got a Daikin as part of M's promo package but I think they are now doing a promo with Fujitsu in NSW.. Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846 Build thread: Metricon Liberty 45 in Ryde, NSW Re: My KDR Metricon Hampshire - Liberty - 45 Melb 410Apr 09, 2017 9:43 pm M loves to change brands frequently Re: My KDR Metricon Hampshire - Liberty - 45 Melb 411Apr 11, 2017 9:56 pm Hi Renman, I know you mentioned this before but how high are your light switched from ground level? And also, if you have an above counter basin for your bathrooms, how high did you sent the counter above ground level? Thx Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846 Build thread: Metricon Liberty 45 in Ryde, NSW Re: My KDR Metricon Hampshire - Liberty - 45 Melb 412Apr 12, 2017 7:24 am Quirmeball1280 Hi Renman, I know you mentioned this before but how high are your light switched from ground level? And also, if you have an above counter basin for your bathrooms, how high did you sent the counter above ground level? Thx Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846 All the main light switches are 1050mm from the ground. All of the bathroom vanities were lifted to 850mm from the standard 750mm. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: My KDR Metricon Hampshire - Liberty - 45 Melb 413Apr 23, 2017 9:11 pm Renman Quirmeball1280 Hi Renman, I know you mentioned this before but how high are your light switched from ground level? And also, if you have an above counter basin for your bathrooms, how high did you sent the counter above ground level? Thx Metricon Liberty 45, Ryde NSW http://forum.homeone.com.au/viewtopic.php?t=82846 All the main light switches are 1050mm from the ground. All of the bathroom vanities were lifted to 850mm from the standard 750mm. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Hi Renman, Is this vanity height change a free charge? If not, how much ? Re: My KDR Metricon Hampshire - Liberty - 45 Melb 414Apr 23, 2017 11:13 pm Free upgraded. As our vanity are floating there's no cost. Re: My KDR Metricon Hampshire - Liberty - 45 Melb 415Apr 23, 2017 11:23 pm Update: We didn't get permit approval from M this week as discussed. Instead we got a request on Thursday from M to ask our next door neighbor if they can have access to their property and dig a hole to do a probe test to check the footing of there extension. The extension is build to the boundary and M has know about this. They even charge me for extra under pinning and a long retaining wall. I have glad that they are been cautious and not damaging the neighbor's property during the build. But why on earth didn't they ask for access a month or two months ago when I handed over the site. Why ask on the second last day of approval. So frustrated with M. It's not like that didn't know that they had to do this. Got told on last Friday that contractor will do the work next Thursday and would take another week to for the report. This means I have to wait another two weeks for M to seek permit approval. I am getting upset over nothing? My KDR Metricon Hampshire - Liberty - 45 Melb 416Apr 23, 2017 11:44 pm Renman Update: We didn't get permit approval from M this week as discussed. Instead we got a request on Thursday from M to ask our next door neighbor if they can have access to their property and dig a hole to do a probe test to check the footing of there extension. The extension is build to the boundary and M has know about this. They even charge me for extra under pinning and a long retaining wall. I have glad that they are been cautious and not damaging the neighbor's property during the build. But why on earth didn't they ask for access a month or two months ago when I handed over the site. Why ask on the second last day of approval. So frustrated with M. It's not like that didn't know that they had to do this. Got told on last Friday that contractor will do the work next Thursday and would take another week to for the report. This means I have to wait another two weeks for M to seek permit approval. I am getting upset over nothing? That sucks. But you know what that's m for ya. I just found out today from an assistant manager of dicaps that there is a shortage on tradies. And therefor the tradies are charging double. And all builders are struggling for tradies. To me I just think there's too many houses getting build in vic and that's why they are struggling. It's more like they are taking too many houses on. But not enough tradies for them. I'm starting to think. That maybe this is done purposely with delays. Because they haven't got enough tradies. And they don't want To tell people that. viewtopic.php?t=86597 Re: My KDR Metricon Hampshire - Liberty - 45 Melb 417Apr 23, 2017 11:53 pm Doulton777 Renman Update: We didn't get permit approval from M this week as discussed. Instead we got a request on Thursday from M to ask our next door neighbor if they can have access to their property and dig a hole to do a probe test to check the footing of there extension. The extension is build to the boundary and M has know about this. They even charge me for extra under pinning and a long retaining wall. I have glad that they are been cautious and not damaging the neighbor's property during the build. But why on earth didn't they ask for access a month or two months ago when I handed over the site. Why ask on the second last day of approval. So frustrated with M. It's not like that didn't know that they had to do this. Got told on last Friday that contractor will do the work next Thursday and would take another week to for the report. This means I have to wait another two weeks for M to seek permit approval. I am getting upset over nothing? That sucks. But you know what that's m for ya. I just found out today from an assistant manager of dicaps that there is a shortage on tradies. And therefor the tradies are charging double. And all builders are struggling for tradies. To me I just think there's too many houses getting build in vic and that's why they are struggling. It's more like they are taking too many houses on. But not enough tradies for them. I'm starting to think. That maybe this is done purposely with delays. Because they haven't got enough tradies. And they don't want To tell people that. viewtopic.php?t=86597 M is just like a every other tradies out there. Promise them the job and once signed and start they go and start another job. That way they have lock in income for the next week/year. Re: My KDR Metricon Hampshire - Liberty - 45 Melb 418Apr 24, 2017 12:01 am Hi Renman, What will be the most expensive upgrade for you so far? We went to the Somerset display home, it is a fantastic house but the price 1.3 mil is way over our budget. Then we went to the Hampshire display is also very good. We are just not sure with budget of 650k how good can the house be. Can M tell you a proper quote before you pay the 5k design fees? Cheers, Aujahua Re: My KDR Metricon Hampshire - Liberty - 45 Melb 419Apr 24, 2017 12:10 am Renman Doulton777 Renman Update: We didn't get permit approval from M this week as discussed. Instead we got a request on Thursday from M to ask our next door neighbor if they can have access to their property and dig a hole to do a probe test to check the footing of there extension. The extension is build to the boundary and M has know about this. They even charge me for extra under pinning and a long retaining wall. I have glad that they are been cautious and not damaging the neighbor's property during the build. But why on earth didn't they ask for access a month or two months ago when I handed over the site. Why ask on the second last day of approval. So frustrated with M. It's not like that didn't know that they had to do this. Got told on last Friday that contractor will do the work next Thursday and would take another week to for the report. This means I have to wait another two weeks for M to seek permit approval. I am getting upset over nothing? That sucks. But you know what that's m for ya. I just found out today from an assistant manager of dicaps that there is a shortage on tradies. And therefor the tradies are charging double. And all builders are struggling for tradies. To me I just think there's too many houses getting build in vic and that's why they are struggling. It's more like they are taking too many houses on. But not enough tradies for them. I'm starting to think. That maybe this is done purposely with delays. Because they haven't got enough tradies. And they don't want To tell people that. viewtopic.php?t=86597 M is just like a every other tradies out there. Promise them the job and once signed and start they go and start another job. That way they have lock in income for the next week/year. That's true. Even thou our consultant did everything right. She never expected them to muck us up so much. I believe she was genuine. Can't say much about the rest. viewtopic.php?t=86597 Re: My KDR Metricon Hampshire - Liberty - 45 Melb 420Apr 24, 2017 9:37 am aujahua Hi Renman, What will be the most expensive upgrade for you so far? We went to the Somerset display home, it is a fantastic house but the price 1.3 mil is way over our budget. Then we went to the Hampshire display is also very good. We are just not sure with budget of 650k how good can the house be. Can M tell you a proper quote before you pay the 5k design fees? Cheers, Aujahua Which Hampshire display did you go to? If you are wanting to spend $650, the option is to keep the Hampshire layout and facade but visit the Liberty or something from the Freedom range. As those house with all its upgrade are around your budget. Message be directly and I can assist if you need. The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.… 2 20084 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 14237 |