Browse Forums Building A New House Re: Our Metricon Duxton 39- Coastal Facade 73Mar 26, 2017 8:24 am 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Re: Our Metricon Duxton 39- Coastal Facade 77Mar 31, 2017 3:50 pm PeteK Hi Emmz, no we aren't putting a light above the stairwell. Opted for a couple of lights on the stairs instead. Not sure where they would locate it if so! Will be interesting to see the house at night to determine whether we have enough light. Thanks Pete. Hoping to get lots of light Re: Our Metricon Duxton 39- Coastal Facade 78Apr 14, 2017 11:45 am Hey Pete, Thanks for posting the info on your build. Fascinating! We're just about to build a Duxton 39 down in Warrnambool. We're toying between Coastal and Isla at the moment.loving some of your ideas, especially the lights on the stairs, twin sinks and your colour schemes... Lots to think about... looks amazing. Cheers Re: Our Metricon Duxton 39- Coastal Facade 79Apr 18, 2017 2:57 pm 3280 Dave Hey Pete, Thanks for posting the info on your build. Fascinating! We're just about to build a Duxton 39 down in Warrnambool. We're toying between Coastal and Isla at the moment.loving some of your ideas, especially the lights on the stairs, twin sinks and your colour schemes... Lots to think about... looks amazing. Cheers Thanks Dave, love Warrnambool! Good luck with your decision making. We are right at the pointy end now, the end is in sight. We originally chose the Coastal, then were told it was out of line/ no longer available and the Isla was the option. We were then informed that there was an Isla down the street, meaning that we needed to select something else! We were then able to have the Coastal, which is great with us as it suits the area Re: Our Metricon Duxton 39- Coastal Facade 80Apr 18, 2017 3:13 pm Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Sorry folks, been a couple of weeks since the last post, school hoidays with the kids got the better of me. I lost a little interest along the way as the progress was sloooowwwww! Our SM gave us a predicted end of March date, that came and went, which we knew it would. Seemed to be trouble organising tradies to come back and finish off little jobs. Anyway, since the last post we have edged a little closer to the finish line and have a tentative PCI of next Monday. (YAY!). Some recent progress includes:
The picture depcits the front of the house (pic is a bit wonky!). The ballustrade has also been installed, awaiting the glass. The builder was there on Easter Saturday, which we think was admirable! This morning on our drive past on the way to work we noticed the framework for the driveway was laid, nice work for Easter Monday we think! Hard to post too many more pics at this stage given we can't get into the house. Hi, First of all, thank you to this community for sharing your thoughts and opinions. We are in early days of our pre-contract stage for Metricon Doulton and we are… 0 10749 Dear Members I have to decide the Facade column size. My custom builder standard is 350mm with rendering, but i asked for 470mm plus stone or tiles and yet to get… 0 7497 traditional gable roof facade - Have you did the dark and light gray color combination in facade with gray stone in facade… 0 4211 |