Browse Forums Building A New House Re: Building with Dennis Family Homes 356Mar 17, 2017 11:17 am Move went well. Exhausting really. Loving it all. Fabulous water pressure. Although can't wait until we have concrete. Telstra mucked up our move so we have no idea when we will have our NBN installed. Here's a pick of the kitchen. Happier with the splash back & benchtop combo now we have appliances installed & things on the bench. Loving all the drawers. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Good luck with everything guys. KDR Under the Flight Path - Dennis Family Homes (Hawkesdale) Re: Building with Dennis Family Homes 357Mar 17, 2017 3:42 pm rondy Move went well. Exhausting really. Loving it all. Fabulous water pressure. Although can't wait until we have concrete. Telstra mucked up our move so we have no idea when we will have our NBN installed. Here's a pick of the kitchen. Happier with the splash back & benchtop combo now we have appliances installed & things on the bench. Loving all the drawers. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Good luck with everything guys. Did you organise the nbn connection prior to settlement? Building with Dennis Family Homes Re: Building with Dennis Family Homes 358Mar 17, 2017 3:47 pm rtforresters rondy Move went well. Exhausting really. Loving it all. Fabulous water pressure. Although can't wait until we have concrete. Telstra mucked up our move so we have no idea when we will have our NBN installed. Here's a pick of the kitchen. Happier with the splash back & benchtop combo now we have appliances installed & things on the bench. Loving all the drawers. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Good luck with everything guys. Did you organise the nbn connection prior to settlement? Yes. NBN was organised over 4 weeks ago through Telstra however none of our orders were processed correctly. Hubby spent over 8 hours on the phone trying to find out what happened. No one called us back to let us know there was a problem. Crazy... KDR Under the Flight Path - Dennis Family Homes (Hawkesdale) Re: Building with Dennis Family Homes 359Mar 17, 2017 4:03 pm rondy rtforresters rondy Move went well. Exhausting really. Loving it all. Fabulous water pressure. Although can't wait until we have concrete. Telstra mucked up our move so we have no idea when we will have our NBN installed. Here's a pick of the kitchen. Happier with the splash back & benchtop combo now we have appliances installed & things on the bench. Loving all the drawers. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Good luck with everything guys. Did you organise the nbn connection prior to settlement? Yes. NBN was organised over 4 weeks ago through Telstra however none of our orders were processed correctly. Hubby spent over 8 hours on the phone trying to find out what happened. No one called us back to let us know there was a problem. Crazy... That's shocking. Hope you guyz get it sorted. So that means no TV or internet?!? They better compensate you for the inconvenience. Building with Dennis Family Homes Re: Building with Dennis Family Homes 360Mar 17, 2017 9:31 pm Our internal walls and doors have been painted and stone bench are on. I couldn't get a photo coz no one was there today so hope i can get some on monday. I cant wait to see the bench and the colours come together. Building with Dennis Family Homes Hi everyone, Newbie renovator here, after some advice for combining our family room in the picture and the alfresco and make a larger family room. There is a flush sill… 0 6114 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 110971 Hi there! Putting the feelers out there for those who have (or almost) built with Arli homes! Interested in your experiences who've built from their stock home designs… 0 27163 |