Browse Forums Building A New House Re: Who's building with Clarendon?? 15164Jun 20, 2016 10:51 am Building Sheridan 34 (38 after upgrades) @ Kellyville, NSW Check out our Clarendon Building Progress Blog Homeone Topic: Clarendon Casadream Build Re: Who's building with Clarendon?? 15167Jun 20, 2016 4:18 pm Building Sheridan 34 (38 after upgrades) @ Kellyville, NSW Check out our Clarendon Building Progress Blog Homeone Topic: Clarendon Casadream Build Re: Who's building with Clarendon?? 15170Jun 20, 2016 6:07 pm Has anyone completed their electrical appointment in Sydney within the last 2 months? Trying to get a hold of a price list viewtopic.php?t=83651 Building a modified Sheridan 35 Re: Who's building with Clarendon?? 15171Jun 20, 2016 6:42 pm bumblebee1985 Has anyone completed their electrical appointment in Sydney within the last 2 months? Trying to get a hold of a price list viewtopic.php?t=83651 Building a modified Sheridan 35 I am also looking for the same. Will really appreciate it. Thanks Re: Who's building with Clarendon?? 15172Jun 20, 2016 7:08 pm HomeTweetHome Just found out that they flipped the design due to driveway gradient requirement and max cut and fill requirement i.e. 500 mm in Blacktown. I am finding this hard to believe as my desired location was to place garage on the lower side of the lot and in the flipped design it is on the higher side. According to Clarendon the only way I can have garage on right side (lower side) is by setting the house back by 9 mtr as opposed to 4.5 mtr. Can someone suggest what questions I should ask them to clarify this? Hi HomeTweetHome, I build a Sheridan 34 and have my garage and driveway on the lower side of the property... check out my blog site... all the details are there. My front set-back is standard which is 4.5m... Building Sheridan 34 (38 after upgrades) @ Kellyville, NSW Check out our Clarendon Building Progress Blog Homeone Topic: Clarendon Casadream Build Re: Who's building with Clarendon?? 15173Jun 21, 2016 12:18 am KLB HomeTweetHome Just found out that they flipped the design due to driveway gradient requirement and max cut and fill requirement i.e. 500 mm in Blacktown. I am finding this hard to believe as my desired location was to place garage on the lower side of the lot and in the flipped design it is on the higher side. According to Clarendon the only way I can have garage on right side (lower side) is by setting the house back by 9 mtr as opposed to 4.5 mtr. Can someone suggest what questions I should ask them to clarify this? Can you post your plans and if you have it a contour survey of your block? Hi, below is the plan with contours. I need that garage on the right hand side. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Who's building with Clarendon?? 15174Jun 21, 2016 1:59 am Some update from my end: - Our SS has moved PCI to this Friday (from Wednesday this week) - Handover is still booked for Wed, 29th Jun - All our shelving has been completed: WIP, WIL, all bedroom wardrobes - Rain garden piping completed - Final painting finishes is being completed Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Building Sheridan 34 (38 after upgrades) @ Kellyville, NSW Check out our Clarendon Building Progress Blog Homeone Topic: Clarendon Casadream Build Re: Who's building with Clarendon?? 15175Jun 21, 2016 7:57 am mrrrrt Some update from my end: - Our SS has moved PCI to this Friday (from Wednesday this week) - Handover is still booked for Wed, 29th Jun - All our shelving has been completed: WIP, WIL, all bedroom wardrobes - Rain garden piping completed - Final painting finishes is being completed Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ It looks amazing!!! Shame they keep moving PCI.. but you are almost there!! With your shelving, does it have support bars in the corners at the front or is it just shelves ? (Does that make sense??) Building a Modified Madison 37. Re: Who's building with Clarendon?? 15178Jun 21, 2016 10:09 am It looks amazing mrrrrt! Just think you are better of having PCI when stuff is done instead of them rushing it and things not being complete Leese usually when externals are done. We still have the lower scaffolding on as they still need to do some external painting. Re: Who's building with Clarendon?? 15180Jun 21, 2016 12:07 pm mrrrrt Some update from my end: - Our SS has moved PCI to this Friday (from Wednesday this week) - Handover is still booked for Wed, 29th Jun - All our shelving has been completed: WIP, WIL, all bedroom wardrobes - Rain garden piping completed - Final painting finishes is being completed Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Hi mrrrrt, your house looks great. I am looking forward to the day I am at that stage, we have been updated by Clarendon to tell us that the developer still will not allow them on site. So this is our first significant delay, they were suppose to have access a month ago. We need this to happen so we can get our fixed pricing completed. I noticed that you have a little rendering on the facade, did this cost a great deal. We have a corner block and our design requirements state that we need two different types of material. So it is either cladding or render. Cheers Lydds Building Boston 36 the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 3132 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 3915 I’m curious about how you went with this. We are planning a KDRB and considering Plantation Homes as a builder. I’m aware that after the demolition another soil test… 1 6328 |