Browse Forums Building A New House 1 Apr 25, 2016 12:54 am 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. Re: Sewer down pipe - any suggestions? 3Apr 25, 2016 8:14 am M Y C U S T O M C O R A L B R O N T E 43 ...............Kitchen! 16 Nov 2016 https://forum.homeone.com.au/viewtopic.php?f=31&t=79581 Re: Sewer down pipe - any suggestions? 4Apr 25, 2016 8:58 am 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. Re: Sewer down pipe - any suggestions? 6Apr 25, 2016 11:27 am The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. Re: Sewer down pipe - any suggestions? 7Apr 25, 2016 12:22 pm 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. Re: Sewer down pipe - any suggestions? 9Apr 25, 2016 9:32 pm 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. Re: Sewer down pipe - any suggestions? 11Apr 26, 2016 6:23 pm 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. Re: Sewer down pipe - any suggestions? 13Apr 26, 2016 8:02 pm 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. Re: Sewer down pipe - any suggestions? 15Apr 26, 2016 9:31 pm 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. Re: Sewer down pipe - any suggestions? 18Apr 26, 2016 10:21 pm thanks for all your answers. If I had known that it was going to be inside the house, we could have brought it through the laundry room, which was adjacent to the room. too late now. 18/03/15 Deposit 02/09/15 CDC 22/09/15 Slab 05/12/15 Frames 15/12/15 Brick started. 11/04/16 Roof start 04/05/16 Roof finish 09/07/16 Gyprock. I think you are getting different numbers because they all just based them on "other jobs" even though each job is unique. Often, with builders, unless you're speaking to… 3 3212 Hi everyone, Looking for some advise. We are about to build an above ground pool in our backyard. There is a private sewer line running under the pool at 1.6m… 0 11731 Hi, I have this sewer inspection point sitting in an odd spot in the rear of my yard: https://imgur.com/ghLI98q What I'd like to do is put a firepit in that corner of… 0 6512 |