Browse Forums Building A New House Re: Building first home with ContentLiving - WA 14Apr 01, 2016 11:34 am Installing Fence would be a good idea. Is your secondary st facing Master bed or Bed 3? What is block size? Is the Soakwell included with ContentLiving? We have designed our WIR of Master Bed as insulation from noise and west side heat. There is a small highlight sliding window in WIR for natural light and ventilation. Re: Building first home with ContentLiving - WA 15Apr 01, 2016 11:18 pm me786 Installing Fence would be a good idea. Is your secondary st facing Master bed or Bed 3? What is block size? Is the Soakwell included with ContentLiving? We have designed our WIR of Master Bed as insulation from noise and west side heat. There is a small highlight sliding window in WIR for natural light and ventilation. The secondary st is on left side of the Bed 3. Our block is almost 500sqm, set back 5m+. CL installed Soakwell for us. Do you know how much is the rough cost of the rendered brick wall fence? I probably need to install, 1.8m height*9m+*3m+*5m. By the way, have you received the water bill? I just received one, have no idea what they have charged? Is it normal? Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ viewtopic.php?f=31&t=82537 Re: Building first home with ContentLiving - WA 16Apr 05, 2016 8:41 pm lilyzhou me786 Installing Fence would be a good idea. Is your secondary st facing Master bed or Bed 3? What is block size? Is the Soakwell included with ContentLiving? We have designed our WIR of Master Bed as insulation from noise and west side heat. There is a small highlight sliding window in WIR for natural light and ventilation. The secondary st is on left side of the Bed 3. Our block is almost 500sqm, set back 5m+. CL installed Soakwell for us. Do you know how much is the rough cost of the rendered brick wall fence? I probably need to install, 1.8m height*9m+*3m+*5m. By the way, have you received the water bill? I just received one, have no idea what they have charged? Is it normal? viewtopic.php?f=31&t=82537 Quite normal to get a water bill. Its mainly for a service charge and sometimes sewerage. We paid about $80 for two months. Our build - Moved In! viewtopic.php?f=31&t=79629 Re: Building first home with ContentLiving - WA 17Apr 05, 2016 10:20 pm We also paid $83 for water service charge. Re: Building first home with ContentLiving - WA 18Apr 05, 2016 11:31 pm RO_14 and me786, thanks for replying. I thought I have paid water bill when I purchased the land and the sewerage charge is part of site work costs. viewtopic.php?f=31&t=82537 Re: Building first home with ContentLiving - WA 19Apr 05, 2016 11:33 pm lilyzhou RO_14 and me786, thanks for replying. I thought I have paid water bill when I purchased the land and the sewerage charge is part of site work costs. viewtopic.php?f=31&t=82537 @lily You will only receive bills once you activate your account with water corp. Our build - Moved In! viewtopic.php?f=31&t=79629 A quick update, we didn't have site start before Easter. Summit can't seem to give me a day when they are scheduled to begin, so I'm left with a vague "within 10-20… 4 26911 Can anyone give me any onfo on New Homes WA? Good or bad, hopefully good just need to know if my choice was good or not? Thanks ❤️ 0 8933 That is a really good attitude Akin to you catch more flies with honey than vinegar. I do enjoy watching that tik tok inspector from Victoria but he does go a little… 12 81847 |