Browse Forums Building A New House Re: Who else is building with Eden Brae? 13155Nov 16, 2015 9:51 pm swiftsport Hi all, I'm still tossing over ducted air conditioning is it better than getting 2/3 reverse cycle units? If yes what brand, why and how much. I know it's better to get it install during build but more expensive. Has anyone had one installed at faction of the cost? Hi swiftsport, I have ducted in the place at Willowdale & reverse cycle in another, & I prefer ducted as my a/c of choice, because it is quieter, gives less fluctuations in temperature while it is cycling, & the air flow is dissipated around the room much more efficiently/better. IMHO a high quality ducted system is cheaper to run than splits/reverse cycle units. I have Daikin splits, & Actron ESP ducted. Both are awesome, & I have no complaints about either (I just prefer the ESP ducted). Both are quiet overall. The ducted cost me above the package allowance, but I can't remember how much the allowance was (sorry - not near my files). The Daikin was in the other place when I bought it (was fully renovated shortly prior to purchase). Re: Who else is building with Eden Brae? 13156Nov 17, 2015 11:01 pm Hi All, I am building Livingstone 22 had my kitchen appointment, they have quoted me $3418 for standard glass splashback. Does that sound right? The credit for tiles was $70 LOL Re: Who else is building with Eden Brae? 13157Nov 17, 2015 11:22 pm Desibloke Hi All, I am building Livingstone 22 had my kitchen appointment, they have quoted me $3418 for standard glass splashback. Does that sound right? The credit for tiles was $70 LOL Lol $70. Splash back off my option list now lol. Heard you can get them from Bunnings or IKEA for a few hundred but have to do it yourself. Re: Who else is building with Eden Brae? 13158Nov 18, 2015 2:38 am Desibloke Hi All, I am building Livingstone 22 had my kitchen appointment, they have quoted me $3418 for standard glass splashback. Does that sound right? The credit for tiles was $70 LOL How big is your kitchen? Any cut outs with the splash back? (For example, around the range hood?). Just to give you an idea, I decided to get my glass splashback done after handover, and I had mine done for $1200. Depending how big your splashback is and how many cut outs, you could be looking at anywhere between $1000-2000 after handover. I had mine installed 1 hour after I was handed the keys too, so no inconvenience caused. I would definitely suggest considering getting it done after. You can always send your kitchen plans to some places to get some quotes. $395 Fixed Priced Landscape Plans for DA M: 0435 127 244 | W: bluegumdesign.com.au | E: info@bluegumdesign.com.au Residential | Commercial | Industrial Re: Who else is building with Eden Brae? 13159Nov 18, 2015 12:46 pm Steven_La has anyone got the quote for the sound proof ? and should we have it ? Eden brae was running a promotion for acoustic insulation, we managed to get all rooms insulated for 1.5k. However between floors were not part of the promotion, we had been quoted for 4k Eden Brae Marina 42 11/5/15. Tender Accepted Re: Who else is building with Eden Brae? 13160Nov 18, 2015 12:56 pm Desibloke Hi All, I am building Livingstone 22 had my kitchen appointment, they have quoted me $3418 for standard glass splashback. Does that sound right? The credit for tiles was $70 LOL They quoted me similar. To me it's too much. I took the credit and doing it after handover. Building Livingstone23 with Eden Brae Homes I built with EB back on 2009. Check out this thread on this forum. viewtopic.php?f=31&t=12911&p=154061#p154061 I can't speak for recent expericience however, we had no… 1 24196 A survey must’ve completed by a certified surveyor. This form part of every DA requirement 3 226482 Elvis has left the building... The site supervisor quit after 2 month on the project. I guess he was just instructed to bark at people, but didn't like when he was… 26 22261 |