Browse Forums Building A New House Re: Porter Davis homes 11828Aug 31, 2015 4:06 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 11832Sep 01, 2015 12:43 pm Blog update. Framing day 43 - Plumbing breather pipe installed. http://itsallaboutthewaldorf.blogspot.com.au/2015/06/framing-day-43-plumbing-breather.html Re: Porter Davis homes 11833Sep 01, 2015 12:47 pm Blog update: The network and entertainment wiring has begun: http://itsallaboutthewaldorf.blogspot.com.au/2015/06/framing-day-43-electrical-and.html Re: Porter Davis homes 11834Sep 01, 2015 12:52 pm Blog update: Solar hot water installed! http://itsallaboutthewaldorf.blogspot.com.au/2015/06/framing-day-43-solar-hot-water-installed.html Re: Porter Davis homes 11835Sep 01, 2015 1:22 pm just wondering, in what condition, has porter has left most of your yards? we're they levelled out? our is a complete mess. EDIT: can anyone also recommend someone who can excavate and level and someone who can build and install a side gate? built the Dunedin 28 with Porter Davis. Re: Porter Davis homes 11836Sep 01, 2015 2:29 pm kateebee just wondering, in what condition, has porter has left most of your yards? we're they levelled out? our is a complete mess. EDIT: can anyone also recommend someone who can excavate and level and someone who can build and install a side gate? They get the site cleaned towards the end of the build. Landscaping and levelling in on the owner to do after hand over unless otherwise agreed. Might want to edit your signature since you are now building with PD. Re: Porter Davis homes 11837Sep 01, 2015 2:37 pm Henley Vogue Check out Henley. We ditched pd last minute. We are now building with Henley. There's very little that you need to upgrade, everything is included. And there's lots to choose from at their selection centre. Funnily enough we did. There was a Henley house we were also tossing up with but they wouldn't let us modify the butler's pantry and the staircase. Re: Porter Davis homes 11838Sep 01, 2015 3:16 pm kateebee just wondering, in what condition, has porter has left most of your yards? we're they levelled out? our is a complete mess. EDIT: can anyone also recommend someone who can excavate and level and someone who can build and install a side gate? our site has been completely cleared except for leftover bricks and soil has been placed around the house Built the Bermuda with Porter Davis Re: Porter Davis homes 11839Sep 01, 2015 3:32 pm joea They get the site cleaned towards the end of the build. Landscaping and levelling in on the owner to do after hand over unless otherwise agreed. Might want to edit your signature since you are now building with PD. My apologies, I have already built and have been in the home for a couple of months now. My signature said 'trying' because we had ALOT of problems. We are looking to landscape and I have had a few quotes done and they are always shocked when they see the backyard, which is the worst part. They didn't clean the site before handover either. We had insulation, cupboard off cuts and general rubbish in both the front and back yard. We asked our SS to organise a rubbish removal but that didn't happen katemorley91 our site has been completely cleared except for leftover bricks and soil has been placed around the house built the Dunedin 28 with Porter Davis. Re: Porter Davis homes 11840Sep 01, 2015 3:37 pm kateebee joea They get the site cleaned towards the end of the build. Landscaping and levelling in on the owner to do after hand over unless otherwise agreed. Might want to edit your signature since you are now building with PD. My apologies, I have already built and have been in the home for a couple of months now. My signature said 'trying' because we had ALOT of problems. We are looking to landscape and I have had a few quotes done and they are always shocked when they see the backyard, which is the worst part. They didn't clean the site before handover either. We had insulation, cupboard off cuts and general rubbish in both the front and back yard. We asked our SS to organise a rubbish removal but that didn't happen katemorley91 our site has been completely cleared except for leftover bricks and soil has been placed around the house My bad. Yes should have been done before PCI/Handover. Our's has been cleaned about 3 times now. As Kate said, we only had the left over bricks we requested, dips and dirt over our easement cover as well. Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12337 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105557 |