Browse Forums Building A New House Re: Celebration Homes - Lennox in Whiteman Edge 21Apr 27, 2015 12:44 pm ++++++++++++ New Generation Homes 'Odyssey' at Whiteman Edge Our Build thread: viewtopic.php?f=31&t=76967&start=20 Re: Celebration Homes - Lennox in Whiteman Edge 39Jun 30, 2015 10:42 am Hi SaberX, I hope Treble doesn't mind me commenting here, but i think Treble had his slabbed laid, a few weeks before he posted the picture, maybe around mid-end of may, I'm pretty sure he is at brick stage now?? Re: Celebration Homes - Lennox in Whiteman Edge 40Jun 30, 2015 2:41 pm Thanks Lozel. I assume one to two months from slab down is a good indicator of time? Just wondering treble and other CH'ers did you have flumed rangehoods, bathrooms etc? Appears only the WC are flumed, but arguably i would think the rangehood and bathrooms are more important to be flumed externally. Ive been told by CH it disipitates easily enough in the roof cavity but wasnt quite convinced. The figure thrown up was fluming was expensive around 900 or so to do which went against what others appear to say here (200 or more to flume their rangehood) i also cant imagine 900 justifiably to vent something outside a roof? Hello everyone, After some suggestions and ideas about how to put a concrete path around the drop edge beam area on our new build. We are required to have a concrete path… 0 13280 get them to replace the chipped tiles. It will stick out like a sore thumb overwise. Also tiler will be siliconing the miters rather than grouting. Grouted miters crack… 1 4223 |