Browse Forums Building A New House Re: Building with Blackett Homes - Canberra 17May 30, 2015 8:14 am Thank you so much , we would like do keep some of the items exclude out of the quote e.g kitchen, joinery, floor to non wet areas. Thinking of organising these ourselves, I know big builders don't like this, blackett said they won't allow other tradies into the site before hand over, did you do organise any work to be done yourself before the handover, any such experience with blackett. Re: Building with Blackett Homes - Canberra 18May 30, 2015 4:38 pm canberrauser Thank you so much , we would like do keep some of the items exclude out of the quote e.g kitchen, joinery, floor to non wet areas. Thinking of organising these ourselves, I know big builders don't like this, blackett said they won't allow other tradies into the site before hand over, did you do organise any work to be done yourself before the handover, any such experience with blackett. They let us do our splashback through Masters (highly recommended by the way, very competitively priced and installed very well) but that was about it as far as non-Blackett tradies goes pre-handover. We had to wait till handover to get the flooring done. I can't see them letting you source your own kitchen - it's just too central to the overall build. When we built with them, they ran a very tight ship. There was always someone on site doing something (on weekdays, anyway) and I think letting other tradies in to do things risks upsetting their scheduling. They let us know weeks in advance when handover would be so we could organise the flooring to come in the day after - they kept to that timing, so it all went smoothly for us. Re: Building with Blackett Homes - Canberra 19May 30, 2015 5:49 pm Shirokuma canberrauser Thank you so much , we would like do keep some of the items exclude out of the quote e.g kitchen, joinery, floor to non wet areas. Thinking of organising these ourselves, I know big builders don't like this, blackett said they won't allow other tradies into the site before hand over, did you do organise any work to be done yourself before the handover, any such experience with blackett. They let us do our splashback through Masters (highly recommended by the way, very competitively priced and installed very well) but that was about it as far as non-Blackett tradies goes pre-handover. We had to wait till handover to get the flooring done. I can't see them letting you source your own kitchen - it's just too central to the overall build. When we built with them, they ran a very tight ship. There was always someone on site doing something (on weekdays, anyway) and I think letting other tradies in to do things risks upsetting their scheduling. They let us know weeks in advance when handover would be so we could organise the flooring to come in the day after - they kept to that timing, so it all went smoothly for us. Thanks, where did you build, is it two storey? How long was the build process Re: Building with Blackett Homes - Canberra 20May 31, 2015 2:02 am [/quote] Thanks, where did you build, is it two storey? How long was the build process[/quote] We built in Bonner. Single storey. We were in exactly 5 months after they started digging dirt. Wow I hadn't realised things had gotten that pricey in just a couple of years since I built, that is crazy with how much land is now costing if you aren't lucky enough to… 3 7231 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 76528 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 107148 |