Browse Forums Building A New House Re: Building in Brooks Reach - Community Thread 3641Aug 05, 2014 10:54 am Far out, how much more do we have to go through before they sort everything out. I'm thinking back to just before it was lodged when we all got that email from Stocklands saying it was going to be at least another two weeks before they would be ready to lodge, and we all got together and when down there - then all of a sudden two days later they lodged it. I'm wondering if they lodged it just to shut us all up knowing that it wasn't ready yet, and that's why it keeps bouncing back. Re: Building in Brooks Reach - Community Thread 3642Aug 05, 2014 11:09 am LOL maybe. But apparently people have called the LPI and they've said they have all the paperwork and it looked good to register this week. It's still only Tuesday so fingers crossed but yeah another minor setback. My bank paperwork expires this month so if it isn't sorted I'll have to go through the whole process again and I won't be happy.... Re: Building in Brooks Reach - Community Thread 3644Aug 05, 2014 11:46 am I might give them a call today....see why its gone back to under requisition... Re: Building in Brooks Reach - Community Thread 3646Aug 05, 2014 11:59 am What stage are you e-mac? Mine still says under requisition Re: Building in Brooks Reach - Community Thread 3649Aug 05, 2014 1:28 pm Dani86 Far out, how much more do we have to go through before they sort everything out. I'm thinking back to just before it was lodged when we all got that email from Stocklands saying it was going to be at least another two weeks before they would be ready to lodge, and we all got together and when down there - then all of a sudden two days later they lodged it. I'm wondering if they lodged it just to shut us all up knowing that it wasn't ready yet, and that's why it keeps bouncing back. I'm thinking the same thing Dani! Re: Building in Brooks Reach - Community Thread 3650Aug 05, 2014 1:35 pm I called the LPI today and they said sub stage 10b still has some mistakes in the paperwork which need to be fixed by Stocklands before they can look at all the paperwork. Probably another 1-2 weeks away they reckon. Re: Building in Brooks Reach - Community Thread 3651Aug 05, 2014 1:44 pm Why does it seem to be only us that is having so much bad luck with our build. On the weekend we noticed the front door frame had totally cracked inside and push out from the house. We had trouble with the door originally as it had warped in the weather but was assured it was replaced. Well no it wasn't. Have today been told that our whole front door and frames have to be replaced and can take up to a week to organise. Apparently they have spoken to our tiler on site today and have arranged something as to not hold him up. Oh and I'm still waiting for a response from my SS as to the text I sent him informing him of this. No I have to get MJH Area Manager - South Coast to go and inspect it for me I GIVE UP!!!!!!! K & J Building Havana 1 McDonald Jones - Brooks Reach NSW Land Deposit 20/1/13 House Deposit paid 27/7/13 Construction Started 23/1/14 Keys Handed over 1/8/14 Re: Building in Brooks Reach - Community Thread 3652Aug 06, 2014 1:57 am Serious that is no good K+J don't let it get to you too much ------------------------------------------------------------------------------------------------------ Built the Nova with MJH completed Dec 2013 Re: Building in Brooks Reach - Community Thread 3653Aug 06, 2014 8:20 am Let's Hope we have better luck today and we don't find out anything else. However, I am waiting on them to inspect my island bench as it has a chip out of the front of it and it looks like this will need to be replaced. Only a 6 week wait for a new bench K & J Building Havana 1 McDonald Jones - Brooks Reach NSW Land Deposit 20/1/13 House Deposit paid 27/7/13 Construction Started 23/1/14 Keys Handed over 1/8/14 Re: Building in Brooks Reach - Community Thread 3654Aug 06, 2014 9:37 am oh no K! I noticed that they laid two different shades of white tiles in our splash-back! Building the Nova with MJH http://thehousethatj-lbuilt.blogspot.com.au "When you are arguing against Him, you are arguing against the very power that makes you able to argue at all." C.S. Lewis Re: Building in Brooks Reach - Community Thread 3655Aug 06, 2014 10:03 am Crap crap crap K!!!! And Joh, have they said they will fix your splashback? Re: Building in Brooks Reach - Community Thread 3656Aug 06, 2014 12:00 pm oh no Joh I have my fingers crossed for you that this is where it will stop K & J Building Havana 1 McDonald Jones - Brooks Reach NSW Land Deposit 20/1/13 House Deposit paid 27/7/13 Construction Started 23/1/14 Keys Handed over 1/8/14 Re: Building in Brooks Reach - Community Thread 3657Aug 06, 2014 12:23 pm With our house package we got all kitchen appliances included. I had asked MJH Not to install my dishwasher as we wouldn't be using this one. Of course they installed it. We have not used it, it has not be turned on. So I have a brand new Smeg Freestanding dishwasher for Sale. Unfortunately it is out of the box and the box has been disposed of. If anyone on here is interested for it or anyone knows someone that might be please let me know. They retail for approx $1,000 I am happy to get $600 for it. All warranty cards and instruction books with dishwasher Pick up only Key Features for 60CM FREESTANDING/BUILT-IN SMEG DISHWASHER DWA214S •14 placesettings •Silver finish •5 Star Water Rating (WELS) •3.5 Star Energy Rating (MEPS) •5 wash programs — soak, normal ECO, ECO, intensive 65º, super •Grey rilson baskets •Upper: 3-level adjustment, EasyGlide •Lower: single tilting rack •Orbital wash system •Ceiling sprayer •Upper spray arm •Six wash directions •Wash temperatures - 45,50,65,70ºC •Delay start timer with auto soak •5-stage water filtration system •Natural condenser drying •Total Acquastop •LED on/off light •End-cycle acoustic indicator •Self-balancing hinges •Noise level - 49 dBA •2 years parts and labour warranty K & J Building Havana 1 McDonald Jones - Brooks Reach NSW Land Deposit 20/1/13 House Deposit paid 27/7/13 Construction Started 23/1/14 Keys Handed over 1/8/14 Hi, Apologies - I know there is plenty out there on this but struggling to put together the puzzle. We're planning our garage/external laundry to master bedroom and… 0 11712 I do enjoy the drama:-D In his latest two videos he has started bringing security guards to site, I am waiting for the punch on to begin lol 6 46340 |