Browse Forums Building A New House Re: The St George build in SA - starting out 3Mar 23, 2014 10:30 am Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: The St George build in SA - starting out 7Apr 08, 2014 9:08 am http://boostaoakfordsa.wordpress.com Site works: 26/8/14 Trench: 2/9/14 Slab: 8/9/14 Frame: 18/9/14 Bricks: 24/10/14 2nd fix: 24/11/14 Handover: End Feb 2015 Re: The St George build in SA - starting out 8Apr 08, 2014 9:52 am Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: The St George build in SA - starting out 9Apr 08, 2014 11:59 am BLOG: http://www.ourphoenix38.blogspot.com.au H1 THREAD: viewtopic.php?f=31&t=70454 Re: The St George build in SA - starting out 10Apr 09, 2014 11:49 am First house - Statesman Greenock (modified) https://forum.homeone.com.au/viewtopic.php?f=31&t=66876 Second house - Fairmont Grand Design (modified) https://forum.homeone.com.au/viewtopic.php?f=31&t=100789 Re: The St George build in SA - earthworks 15Apr 26, 2014 8:16 am BLOG: http://www.ourphoenix38.blogspot.com.au H1 THREAD: viewtopic.php?f=31&t=70454 Re: The St George build in SA - earthworks 19Jun 04, 2014 9:20 pm insider St george build and bluesteel You both would have got class "p" classification for your sites I'm guessing and if so what did the engineer recommend for you footings good to follow your progress Have a P site with e-d soil (yippppeee). They have recommended 900 deep piers with 92 mesh 100 thick slab The saving grace hopefully is there is no fill. Are you having soil issues insider? Re: The St George build in SA - earthworks 20Jun 05, 2014 12:59 am The house you knocked over looks a bit like our current house Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing… 7 17618 Hi We have finally decided to complete a KDR on our corner plot in NE Melbourne suburbs. Given its a corner plot approx. 400 sqm just a standard design may not fit the… 0 8577 |