Browse Forums Home Theatre & Automation Re: Home automation & Aud/vid integration with Carlisle buil 6Apr 30, 2014 2:55 pm paulw11 Nick2k 1 Internal data point costs you approx $160. (costing cannot be more then $5-$10 if you buy the cat6e wire roll yourself) $160 is high I agree, but your estimate is equally too low. 305m of reasonable quality Cat 6 is $130, so say 40c/m. A typical run is 30m, so $12 of cable. A Cat 6 socket is about $6, $12 for two (If you use a patch panel it works out about the same if you divide the patch panel cost by 24 sockets). Your "parts" are $24. Then you need labour - say $35 (I estimate about 30 minutes per run (This includes first and second fix) and my contract lists the electrician as $65+GST/hr - but that was 2 years ago). So, the minimum you could expect is about $60 or $68 if you have a 15% markup from the builder. I would say that you should be able to get two points run to the same location for extra parts, but no extra labour - so $84 or $96 I agree with your calculations, but if he can do it himself it will cost less but yes he must be qualified and have proper understanding how it works. Still $160 per switch by builder is really on a very high side. Re: Home automation & Aud/vid integration with Carlisle buil 7Apr 30, 2014 3:02 pm Nick2k I agree with your calculations, but if he can do it himself it will cost less but yes he must be qualified and have proper understanding how it works. Still $160 per switch by builder is really on a very high side. That's one of the reasons I didn't go with a package builder. My builder was very flexible and happy for me to organise things like the kitchen, garage door, lights and flooring without any markup. I could also do my own data cabling as I have my registration. Re: Home automation & Aud/vid integration with Carlisle buil 8May 05, 2014 11:21 am Although I haven't worked on a project with Carlisle, we have worked with a few others. With the more difficult builders we have been able to gain access on a weekend just before insulation is due to go in. As for wiring, the electrical wiring will be different depending on the type of lighting automation you go with, you will also need speaker wire and lots of Cat5/6 installed around the place. If you need any help feel free to reach out Dave Dave Goralski Coolabode Automation Award Winding Home Automation solutions http://www.coolabode.com.au http://www.facebook.com/coolabodeaustralia http://au.linkedin.com/in/davegoralski 0428-819-340 Building Standards; Getting It Right! 1. optional, you can but normally just use the earth from the main switch board 2. should be enough but the distance determines voltage drop - sparky should work it… 1 28895 We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37462 Carlisle use to sneak a water resistant "Performance Solution" into their contracts. Have you checked your contract for same? 4 10362 |