Browse Forums Building A New House Re: The St George build in SA - starting out 3Mar 23, 2014 10:30 am Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: The St George build in SA - starting out 7Apr 08, 2014 9:08 am http://boostaoakfordsa.wordpress.com Site works: 26/8/14 Trench: 2/9/14 Slab: 8/9/14 Frame: 18/9/14 Bricks: 24/10/14 2nd fix: 24/11/14 Handover: End Feb 2015 Re: The St George build in SA - starting out 8Apr 08, 2014 9:52 am Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: The St George build in SA - starting out 9Apr 08, 2014 11:59 am BLOG: http://www.ourphoenix38.blogspot.com.au H1 THREAD: viewtopic.php?f=31&t=70454 Re: The St George build in SA - starting out 10Apr 09, 2014 11:49 am First house - Statesman Greenock (modified) https://forum.homeone.com.au/viewtopic.php?f=31&t=66876 Second house - Fairmont Grand Design (modified) https://forum.homeone.com.au/viewtopic.php?f=31&t=100789 Re: The St George build in SA - earthworks 12Apr 26, 2014 7:33 am So the other day I drove past the block and was amazed to find a truck parked in the front... the earthworks had begun! Here is the start Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Some old pipes they dug up Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Base is prepared Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Trenches Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ More trenches that look like lamingtons Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: The St George build in SA - earthworks 13Apr 26, 2014 7:36 am There was one glitch along the way... The digger hit some of the old footings were still in the ground. Apparently this rarely happens, but it happened to us. Old footings Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ However the demolition company were very responsive and came out and cut the required sections away Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: The St George build in SA - earthworks 14Apr 26, 2014 7:45 am Looking good, it will be a big house! Re: The St George build in SA - earthworks 15Apr 26, 2014 8:16 am Good to see things coming together. BLOG: http://www.ourphoenix38.blogspot.com.au H1 THREAD: viewtopic.php?f=31&t=70454 Re: The St George build in SA - starting out 16Apr 26, 2014 10:43 am deluxes Surely a quick Spray n' wipe inside & a lick of paint on the outside would've restored it to its former glory? I think that pretty much describes the rental I was in before our home was ready. Re: The St George build in SA - earthworks 17May 30, 2014 7:07 am Hi, Going to follow your build Your posts came up when I searched the dreaded E-D soil. We are in Kensington and has came up same - waiting on our footings. The house we are going to demolish is cracked a lot. Did you worry about building on the ED soil? Have they employed any special measures to protect your slab/foundations. Look forward to hearing more !! Re: The St George build in SA - earthworks 18Jun 01, 2014 9:23 pm St george build and bluesteel You both would have got class "p" classification for your sites I'm guessing and if so what did the engineer recommend for you footings good to follow your progress Re: The St George build in SA - earthworks 19Jun 04, 2014 9:20 pm insider St george build and bluesteel You both would have got class "p" classification for your sites I'm guessing and if so what did the engineer recommend for you footings good to follow your progress Have a P site with e-d soil (yippppeee). They have recommended 900 deep piers with 92 mesh 100 thick slab The saving grace hopefully is there is no fill. Are you having soil issues insider? Re: The St George build in SA - earthworks 20Jun 05, 2014 12:59 am The house you knocked over looks a bit like our current house Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing… 7 17628 Hi We have finally decided to complete a KDR on our corner plot in NE Melbourne suburbs. Given its a corner plot approx. 400 sqm just a standard design may not fit the… 0 8579 |