Browse Forums Building A New House Re: Redink SOR rear build - PCI in sight...sort of? 582Jan 24, 2014 7:55 pm Our RedInk Build Thread - viewtopic.php?f=31&t=64118&p=1004131#p1004131 ** Timeline Page 1 Moved In - 19.12.13 Re: Redink SOR rear build - PCI in sight...sort of? 584Jan 25, 2014 12:37 am building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink SOR rear build - PCI in sight...sort of? 586Jan 25, 2014 10:52 am building with Redink Prestart 21/3/13 Slab down 12/6/13 Brickwork started 5/8/13 Brickwork finished 26/8/13 Roof frame 6/9/13 Colorbond 26/9/13 Grey float 11/10/13 white set 17/10/13 Re: Redink SOR rear build - PCI in sight...sort of? 595Jan 25, 2014 12:03 pm asj25 Ah that sound a good Mandy. Yeah I can't believe they rendered over so many of our points! They were originally there, we just didn't pick up until later on. Though I can't believe our SS didn't notice we were missing so many points! We have raised issues as soon as we see them, but they don't action. As soon as door went in we said it was wrong, we were told 'oh we will replace that later on'. Now we are told that they will just replace the glazing?! But this still isn't done It frustrates and amazes me how they want to just leave things until 'later'. JUST FIX THE F..... THING NOW!!! If you leave it until later it creates more issues - see your power points/tiling for example. Arrrghhh! And breathe! Re: Redink SOR rear build - PCI in sight...sort of? 596Jan 29, 2014 9:24 pm So nothing has really been done this week. Apparently all the jobs are the things 'they do at the very end' I feel like yelling 'ARE WE NOT AT THE F******* END?' Haha. Apparently still waiting to hook up power?! But I don't understand why that means they can't fix the front door etc. So they think MAYBE PCI next week. At this point I just want them to set a date and stick to it. This has been a much longer build than anticipated given the relatively small size of the house and the fact that it was pretty basic from redinks perspective ie no floors/no render/no fancy frontage/no paving /no painting. Re: Redink SOR rear build - PCI in sight...sort of? 597Jan 30, 2014 5:54 pm What work is left to do? Fix up the tiling, A/C panel, and front door? Chase that PCI date. Redink Homes in Banksia Grove Handover 13/02/14 https://forum.homeone.com.au/viewtopic.php?f=31&t=65768&p=1068366#p1068366 Re: Redink SOR rear build - PCI in sight...sort of? 599Jan 30, 2014 6:50 pm That's not far away at all! It'll come quickly. Building with Dale Alcock Homes in Aveley Our thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=63880 And yes, my pants are indeed fancy. Hi All, see above image. The required setback from the rear boundary in my case is 5m, as you can see the shape of the site and location of the boundary is slightly… 0 8431 You have no photo with your post. Best I can say is to remove an A&L flyscreen don't be afraid to distort the frame almost like a trapezium. It doesn't take a lot of… 1 7062 |