Browse Forums Building A New House Re: PCI not far off 122Sep 26, 2013 8:33 am Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 125Sep 30, 2013 9:39 pm Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 128Oct 08, 2013 9:04 pm Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 130Oct 09, 2013 9:35 am Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 134Oct 16, 2013 4:54 pm Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 136Oct 16, 2013 5:52 pm Site Works 9/5/13 Slab 4/6/13 Frame 4/7/13 Fascia/Gutters 10/7/13 Windows 11/7/13 Roof 24/7/13 Gyprock 13/8/13 Lock up 26/8/13 Bricks 2/9/13 Kitchen 11/9/13 Tiling 28/9/13 Re: PCI not far off 138Oct 17, 2013 12:32 pm Hope its all gone well for you today! Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: PCI not far off 139Nov 16, 2013 9:45 pm Hi miss mia, I hope all is going well. I drove past the other day and admired your swimming pool The OP has gone The latch and striker are definitely not aligned but there was no point trying to help the OP understand that. Hence the reason they are no longer with us. 12 5698 We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports with photos at every stage,… 6 7159 i would not be signing anything on the day read your contract about when builder submits final invoice generally, have to meet builder within 7 days of receiving final… 1 4749 |