Browse Forums Building A New House Re: PCI not far off 122Sep 26, 2013 8:33 am Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 125Sep 30, 2013 9:39 pm Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 128Oct 08, 2013 9:04 pm Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 129Oct 08, 2013 9:12 pm So sorry to hear this Miss Mia. I hope you can get all the problems fixed with minimal issue. Re: PCI not far off 130Oct 09, 2013 9:35 am Fingers crossed Fairmont. The frustration is very annoying. We can accept there will be issues along the way but the sum of the parts adds up unfortunately. Reality is any Builder should take pride in the work and Customer Experience. Maybe with my vocation I am use to delivering a high level of professional service and set the expectations to high !!! Then I know I don't when the windows are presented like that as if someone took to them with a stick. Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 131Oct 09, 2013 10:09 am Bad service annoys me too. There are so many things already that could have been a big problem such as wrong brick laid if we were not micro managing.
As for the windows I don't get why they did not stop when they scratched the first one! Re: PCI not far off 132Oct 09, 2013 1:09 pm Doesn't look acceptable to me. I'd want repairs, and repairs that make it look like new, not just patch ups that are obvious. You are paying a lot of money for your house and you deserve to get what you pay for, not poor quality materials or workmanship. Hope everything is sorted soon. Re: PCI not far off 133Oct 09, 2013 3:55 pm Meant to say that there was a guy in an m ute there this morning and a painter. Re: PCI not far off 134Oct 16, 2013 4:54 pm D day tomorrow, official Handover after 2 x Pre-Handover. The message got across last Friday and come Monday 7am there was no less that 2 sparkies, 3 painters and a tiler all working through it. Unfortunately as reported earlier as to the condition of our window frames they are to all be replaced after handover. Shall report in once the keys are to hand and hopefully the HWS and Gas Hob all installed. Exciting times Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 Re: PCI not far off 135Oct 16, 2013 4:56 pm Good to hear that they are fixing all issues and that you will have keys soon. Shame about the windows, will be a big job. Stupid cleaners! Re: PCI not far off 136Oct 16, 2013 5:52 pm I'm so glad to hear all issues will be rectified, it must have been pretty stressful! All the best for tomorrow Site Works 9/5/13 Slab 4/6/13 Frame 4/7/13 Fascia/Gutters 10/7/13 Windows 11/7/13 Roof 24/7/13 Gyprock 13/8/13 Lock up 26/8/13 Bricks 2/9/13 Kitchen 11/9/13 Tiling 28/9/13 Re: PCI not far off 137Oct 17, 2013 12:27 pm Pity the windows will have to be done after handover, but must be exciting to be so close to moving in. Re: PCI not far off 138Oct 17, 2013 12:32 pm Hope its all gone well for you today! Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: PCI not far off 139Nov 16, 2013 9:45 pm Hi miss mia, I hope all is going well. I drove past the other day and admired your swimming pool The OP has gone The latch and striker are definitely not aligned but there was no point trying to help the OP understand that. Hence the reason they are no longer with us. 12 5698 We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports with photos at every stage,… 6 7159 i would not be signing anything on the day read your contract about when builder submits final invoice generally, have to meet builder within 7 days of receiving final… 1 4749 |