Browse Forums Building A New House Re: Porter Davis homes 8196Sep 26, 2013 8:59 pm Corz11 Hey Lurgen, We had our Wall TV points installed and they are not reacessed into the wall, was there any issue with swapping them over for you? Yep. Make sure they don't put them too high. Mine ended up a good 15cm higher than I had asked for. If you check your Argus sheet it will explicitly refer to recessed wall mounts so there shouldn't be too much hassle from PD at least. I wasn't thrilled with the quality of the install though. In retrospect it would have been better (and a lot cheaper) to handle this after handover. HD Re: Porter Davis homes 8197Sep 26, 2013 9:09 pm Corz11 Hey Lurgen, We had our Wall TV points installed and they are not reacessed into the wall, was there any issue with swapping them over for you? Hi Corz, I have just posted pictures of the recessed points for wall mounted TV on my blog. This is how it was done for us. Look at the latest post and scroll to the bottom and you will see a heading "Electricals", you can clearly see how they are recessed. Re: Porter Davis homes 8198Sep 27, 2013 7:54 am Good luck for your pci today mumma Dj! Hope it all goes well Re: Porter Davis homes 8199Sep 27, 2013 8:08 am clairemumto5 Good luck for your pci today mumma Dj! Hope it all goes well Thanks Claire for thinking of us, unfortunately postponed due to some things not finalised. So PCI now next Thursday. Great that our SS didn't want to present an unfinished house to us. I have my Independent Inspection on Monday. It appears now that all things have been attended to (just about) and the house cleaners are due to come in today. Re: Porter Davis homes 8200Sep 27, 2013 8:45 am MummaDJ clairemumto5 Good luck for your pci today mumma Dj! Hope it all goes well Thanks Claire for thinking of us, unfortunately postponed due to some things not finalised. So PCI now next Thursday. Great that our SS didn't want to present an unfinished house to us. I have my Independent Inspection on Monday. It appears now that all things have been attended to (just about) and the house cleaners are due to come in today. Good Luck for Thursday MummaDJ, not long to go now! We finally had handover last Friday! yay! There is still a couple of minor things that need fixing which our SS is on top of, but other than that I love our new home. Building the Montague 21 Site Start: 22/05/13 Slab: 11/06/13 Frame: 13/06/13 Lockup: 12/07/13 Fix Stage Complete: 17/07/13 PCI: 09/09/13 Handover :20/09/13 Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 13970 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 109506 Hi there! Putting the feelers out there for those who have (or almost) built with Arli homes! Interested in your experiences who've built from their stock home designs… 0 26589 |