Browse Forums Building A New House Re: Masterton Homes - santorini porcelin tiles? 2Jul 11, 2013 8:26 am Deposit paid to Masterton 30/05/13 Contracts signed and 5% deposit paid 09/10/13 CDC Approval 14/11/13 Slab 22/01/14 Frame 18/02/14 Brickwork 14/03/14 Roof 22/03/14 Lock Up 11/04/14 Re: Masterton Homes - santorini porcelin tiles? 10Jul 22, 2013 1:27 pm Deposit paid to Masterton 30/05/13 Contracts signed and 5% deposit paid 09/10/13 CDC Approval 14/11/13 Slab 22/01/14 Frame 18/02/14 Brickwork 14/03/14 Roof 22/03/14 Lock Up 11/04/14 Re: Masterton Homes - santorini porcelin tiles? 20Sep 14, 2013 8:00 pm Hi folks There is another product you can use around the island bench instead of beading. The salesperson from Don's Tiles at Bella Vista showed us, but I forget what it is called. It looked a lot better, more streamlined. He even had a picture on his phone to show us. It was only a couple of hundred dollars extra for a better finish. We are looking at the laminate timber because we have an inside dog that will just scratch the hell out of bamboo. We have the Santorini tiles in our tender, but would love to get a credit back and change to this high quality laminate. We are presently waiting on contracts and I was going to bring this up at our colour appointment. I hope I haven't left it too late Ally Deposit paid to Masterton 30/05/13 Contracts signed and 5% deposit paid 09/10/13 CDC Approval 14/11/13 Slab 22/01/14 Frame 18/02/14 Brickwork 14/03/14 Roof 22/03/14 Lock Up 11/04/14 4 16752 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74731 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105623 |