Browse Forums Building A New House Re: Building the Simonds Sierra in SA 3Jul 23, 2013 4:19 pm Thread: viewtopic.php?f=31&t=66299 Slab: 16/6/14 Frame: 4/7/14 Roof: 22/7/14 Lock Up: 20/8/14 Fixing: 26/8/14 PCI: 9/10/14 Handover: 20/10/14 Re: Building the Simonds Sierra in SA 16Jul 24, 2013 4:13 pm Site Works 9/5/13 Slab 4/6/13 Frame 4/7/13 Fascia/Gutters 10/7/13 Windows 11/7/13 Roof 24/7/13 Gyprock 13/8/13 Lock up 26/8/13 Bricks 2/9/13 Kitchen 11/9/13 Tiling 28/9/13 Re: Building the Simonds Sierra in SA 19Jul 28, 2013 5:43 pm Oh and on another note, drove out to our block today to have another look and their is a porta toilet their. Does this mean building will start soon Re: Building the Simonds Sierra in SA 20Jul 28, 2013 6:03 pm A loo's a great sign!! Site Works 9/5/13 Slab 4/6/13 Frame 4/7/13 Fascia/Gutters 10/7/13 Windows 11/7/13 Roof 24/7/13 Gyprock 13/8/13 Lock up 26/8/13 Bricks 2/9/13 Kitchen 11/9/13 Tiling 28/9/13 My land is 260m2 (10m x 26m) located in claymore NSW. Under campbelltown council. I know in general the following setbacks would apply ground floor side setback =… 0 7161 Hey guys building a new place through a volume builder and just wondering if i should complain to the site supervisor as we just had plasterboard installed. Looks like… 0 11599 |