Browse Forums Building A New House Re: Porter Davis homes 7682Jul 21, 2013 8:13 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 7690Jul 22, 2013 5:27 pm Porter Davis Homes Questions? Call 1800PORTER Mon - Fri 9am-8pm Sat - Sun 10am-4pm info@porterdavis.com.au http://blog.porterdavis.com.au/ http://www.porterdavishomes.com.au Re: Porter Davis homes 7697Jul 22, 2013 8:52 pm ajd78 Today we signed our final construction drawings!! YAY! The slab will be poured in two weeks... (weather permitting) Ftd - we were told the same thing - cant have on external walls... We were told that was due to being upstairs... Are you building single or double? I were able to build a small one tho under the shower head attachment. Did they give you that option? We are building a single story and we were also told the niche and shower head couldn't go on the same wall! Re: Porter Davis homes 7698Jul 22, 2013 10:07 pm ftfd - you are right.. I had not noticed that before We were told that they were on the same wall but now that I have looked at drawings, they are not and we have what you described with the tap coming off the external wall... It doesn't matter with our shower because we made it bigger, but I can understand it being a problem if smaller... mummadj - that is still amazingly quick! I think they want the money (not that we should complain). They have brought our site start up 4-6wks earlier than expected also.. glad we were ready... Re: Porter Davis homes 7699Jul 22, 2013 10:10 pm ajd78 ftfd - you are right.. I had not noticed that before We were told that they were on the same wall but now that I have looked at drawings, they are not and we have what you described with the tap coming off the external wall... It doesn't matter with our shower because we made it bigger, but I can understand it being a problem if smaller... mummadj - that is still amazingly quick! I think they want the money (not that we should complain). They have brought our site start up 4-6wks earlier than expected also.. glad we were ready... Fantastic to start earlier, that is exciting! Look forward to following your journey. Re: Porter Davis homes 7700Jul 22, 2013 10:12 pm oooh, I just checked our contract and it says 238 days including Christmas... hopefully it might be earlier then if they are speedy and the weather stays clear!!! yay!! (we are in zone 1)... wow, wonder why takes longer closer to the city? Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12336 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105553 |