After some advice/info as to how lights are usually installed into feature niche/recesses like the below photo:
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
My house is currently at this stage:
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
This is my plan:
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
So I have a niche that has the top at 26c and the bottom at 12c and a bulkhead placed at 25c which I am assuming is put in when the walls are finished. The wall is double brick except for the niche part and there is no cavity between the two walls. How do the lights get connected through to the ceiling? We are installing all lighting after handover and currently only have a junction box above the niche in the ceiling. The builder is fully aware of what we want to do and this is why the bulkhead has been placed in there but I can't think of any way of the lights being installed after handover??