Hi everyone, am a first time builder and been recommended this site for info so first time poster!
Am building a double storey with PD and was wanting to know if downlights can be installed after building has finished. PD charge bout $80 a downlight so trying to cut costs as much as possible. If we just install the regular battenn light downstairs, can downlights be wired from this later on or should wiring be done beforehand? We've been told that all downlights downstairs need to be wired during building by our PD rep but a lighting supplier has said they can wire from the baton light so don't know if this is correct or not.