Browse Forums Lighting + Lighting Design 1 Sep 22, 2007 10:07 am Hi all,
I had a look through the window the other day and noticed that some powerpoints are missing and also there are no downlights as per our electrical plan. We have just finished the fix stage...all plastering/painting seems to have been done. Does anyone think that the builder has messed up and the electricals should already have been done? How difficult would it be to rectify? Cheers Re: When is the electricals/lighting done? 2Sep 22, 2007 11:32 am NO….he’s probably waiting for the sparky to come back.
All of these things can be done very quickly and can easily be left till last. Internal and External Building and Colour Consultant Online - Worldwide http://www.denovoconcepts.com Re: When is the electricals/lighting done? 3Sep 22, 2007 8:38 pm Michelle NO….he’s probably waiting for the sparky to come back. All of these things can be done very quickly and can easily be left till last. Great..thanks Michelle. I work with owner, he/she is my man on the ground and I instruct them when to visit the site and take photos and I have other tools in the bag. 4 15443 I am in the same situation, would you be able to give some insights in to this? I am in SA 8 17198 Depends what you're current inclusions are, but we're not including wardrobes and will just use second hand ones until we can save later on to get them built. Also have a… 3 11830 |