Browse Forums Flooring & Floor Covering 1 Oct 07, 2018 8:45 am Hi All, Longtime reader of this forum and first time poster. Im renovating an old california bungalow and due to variances in in existing floor levels and finishes i need to bring the floor levles up approx 20mm in some rooms. Iam planning on doing this by sheeting over the existing floorboards with 19mm plywood. Just a couple of questions: 1. Am i better to screw fix or nail fix and does this need to be through the boards to the joists? 2. Do i need to run the plywood at 90 degrees to the floorboards? 3. Do i need to provide glue between the two as well. Any advice is much appreciated. 1 26525 Hi there, We are currently building a veranda off the side of an existing Olympic shed. Does anyone have experience with fixing through corrugated wall sheets. I am… 0 7654 Thanks for the detailed comments chippy, I'll use this as a guide. 3 12922 |