Browse Forums Flooring & Floor Covering 1 Jul 24, 2011 1:29 pm The house is split level - so the floor is half concrete and half flooring sheet (yellow tongue). The slab is not level (due to being poured on a very hot day and under staffed) and due to us adding another area onto it. and the wooden floor got very wet (due to being open to the elements during the wettest time for years). We need to get it all level before the final flooring will be done. What is the best way?? We dont want to muke around trying to bodge it up, and dont know that using a leveliing compound would be the best way.... We think maybe we should pour concrete over the whole floor for 25mm or something like that? so we are making a new floor, not trying to level the old one?? is that the best way? would concrete take over the wooden floor??? isn't a garage level with the rest of the house a given? pretty sure they 'came around' long time ago. if you have a flat block, the garage is usually level with the rest… 1 17413 interesting situation what happened after builder issued final invoice? did you list as defect or not does the building surveyor have any responsibility? ie. issuing… 13 46800 6 55176 |