We have had our timber floor down about 3 or 4 weeks now. We went for the wider board. The main floor is perfect, but the floor in the entry is cupping badly. The main floor was fitted first and the entry was last. It sounds hollow in places where the floor has totally lifted and has so many humps you can almost trip over them.
The company is asking us to be patient to let the floor settle. As it is most of the boards that are cupping, I am a bit concerned. How long should I wait and what can I expect to happen with the company. I have no idea what is acceptable after this happening. Many thanks