Sub-floor must be smooth, flat and clean (& dry).
Cut carpet edges should be seam sealed before heat seaming.
Carpet should be laid out into place for a day before it is installed, to acclimatise. (Climate should be as per Standards when being laid. Relative humidity from 30-75% and temp from 10-35 degress C).
Underlay should be neatly installed up to the smoothedge, and joins taped with 2" masking tape.
Cut carpet edges should be seam sealed before heat seaming.
Carpet should be laid out into place for a day before it is installed, to acclimatise. (Climate should be as per Standards when being laid. Relative humidity from 30-75% and temp from 10-35 degress C).
Underlay should be neatly installed up to the smoothedge, and joins taped with 2" masking tape.